Laserfiche WebLink
Table 7-4. Normal Year Supply and Demand Comparison <br />(DWR Table 7-2 Retail)......................................................................................................7-9 <br />Table 7-5. Single Dry Year Supply and Demand Comparison <br />(DWR Table 7-3 Retail)......................................................................................................7-9 <br />Table 7-6. Multiple Dry Years Supply and Demand Comparison <br />(DWR Table 7-4 Retail)....................................................................................................7-10 <br />Table 7-7. Projected Zone 7 Supplies for Drought Risk Assessment.................................................7-12 <br />Table 7-8. Five -Year Drought Risk Assessment Tables to Address Water Code Section 10635(b) <br />(DWR Table 7-5).....................................................................................................................7-13 <br />Table 10-1. Notification to Cities and Counties <br />(DWR Table 10-1 Retail).................................................................................................10-2 <br />LIST OF FIGURES <br />Figure 3-1. City of Pleasanton Limits and Current Water Service Area...............................................3-2 <br />Figure 3-2. Known Proposed Developments.......................................................................................3-8 <br />Figure 6-1. Kern County Groundwater Banks Operations...................................................................6-7 <br />Figure 6-2. Livermore Valley Groundwater Basin and Subbasins.......................................................6-9 <br />Figure 6-3. Main Basin Groundwater Storage...................................................................................6-10 <br />Figure 6-4. Artificial Recharge, Pumping, and Net Cumulative Impacts to Operational Storage .....6-12 <br />Figure 6-5. City of Pleasanton Recycled Water System.....................................................................6-20 <br />Figure 6-6. Bay Area Regional Desalination Project: Diversion and Conveyance Facilities...............6-26 <br />Figure 6-7. Delta Conveyance Project: Potential Facilities................................................................6-28 <br />Figure 6-8. Sites Reservoir Project: Location and Facilities...............................................................6-31 <br />LIST OF APPENDICES <br />Appendix A. Legislative Requirements <br />Appendix B. Demonstration of Reduced Delta Reliance <br />Appendix C. DWR 2020 Urban Water Management Plan Tables <br />Appendix D. DWR 2020 Urban Water Management Plan Checklist <br />Appendix E. Agency and Public Notices <br />Appendix F. 2019 Distribution System Water Loss Audit <br />Appendix G. SB X7-7 Compliance Form <br />Appendix H. Zone 7 Annual Report for the Sustainable Groundwater Management Program <br />2019 Water Year (Executive Summary) <br />N-680-60-20-04-WP-R-680-2020UWMP <br />Vii City of Pleasanton <br />2020 Urban Water Management Plan <br />May 2021 <br />