My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
030221
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 9:07:13 AM
Creation date
2/25/2021 9:07:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/2/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. <br /> A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PLEASANTON <br /> AUTHORIZING THE MAYOR TO EXECUTE THE GRANT OF A UTILITY <br /> DISTRIBUTION EASEMENT TO PACIFIC GAS AND ELECTRIC ACROSS THE <br /> LIVERMORE PLEASANTON FIRE STATION NO. 3 PROPERTY LOCATED AT 3200 <br /> SANTA RITA ROAD TO PROVIDE GAS AND ELECTRIC SERVICES TO THE <br /> PROPERTY <br /> WHEREAS, City is demolishing and reconstructing the Livermore Pleasanton Fire <br /> Station No. 3 (the "Project"); and <br /> WHEREAS, Pacific Gas and Electric will supply gas and electric utilities to the <br /> project site requiring equipment be located in close proximity to the project site; and <br /> WHEREAS, land space on the small project site is limited; and <br /> WHEREAS, a design goal of the project is to make pedestrian and motorist views <br /> of the finished project from West Las Positas and Santa Rita Road attractive, and <br /> WHEREAS, the required Pacific Gas and Electric equipment located in the public <br /> right of way on either West Las Positas or Santa Rita will is inconsistent with the aesthetic <br /> goal. <br /> WHEREAS, City has proposed a location for the equipment on the site that does <br /> not interfere with station operations and is out of public view, and <br /> WHEREAS, Pacific Gas and Electric has agreed to the location but requires a <br /> utility distribution easement granting rights to install and operate their equipment in the <br /> identified. <br /> NOW, THEREFORE BE IT RESOLVED THAT THE CITY COUNCIL OF THE <br /> CITY OF PLEASANTON DOES RESOLVE, DECLARE, DETERMINE AND ORDER <br /> THE FOLLOWING: <br /> SECTION 1. Authorizes the Mayor to execute the Utility Distribution Easement, as <br /> generally shown in the Exhibit One, subject to minor modifications by the City Manager <br /> as approved by the City Attorney, as well as other necessary related documents. <br /> SECTION 2. This resolution shall become effective immediately upon its passage <br /> and adoption. <br /> SECTION 3. City Clerk shall certify to the passage of this resolution and enter it <br /> into the book of original resolutions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.