My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
021621
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 1:01:42 PM
Creation date
2/10/2021 1:01:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/16/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT #2 <br /> p wra <br /> ENVIRONMENTAL CONSULTANTS <br /> CITY OF PLEASANTON <br /> STREAM AND POND MAINTENANCE PROGRAM <br /> BIOLOGICAL SUPPORT AND REGULATORY AGENCY PERMITTING <br /> CHANGE ORDER 03 <br /> Prepared for: <br /> City of Pleasanton <br /> Operations Services Department <br /> P.O. Box 520 <br /> Pleasanton, CA 94566 <br /> Attn: Rita Di Candia <br /> January 25, 2021 <br /> WRA Project No. 29118 <br /> PURPOSE <br /> The purpose of this Change Order is to request funds to complete the Phase 2 for agency submittals and <br /> permit processing which includes preparation of a new document. We found that the remaining funds <br /> are insufficient to complete permit coordination and preparation of a new document as requested by the <br /> Regional Water Quality Control Board. With Change Order 3 funds,we are intending to prepare a Habitat <br /> Mitigation and Monitoring Plan and conduct agency coordination to obtain the final permits. <br /> ADDITIONAL WORK PRODUCTS <br /> • Draft and Final Habitat Mitigation and Monitoring Plan <br /> • Permit Processing Support <br /> ADDITIONAL SCOPE OF WORK <br /> In addition to the original Scope of Work and Change Order 1, the following tasks are added <br /> PHASE 2, REGULATORY PERMITTING <br /> Phase 2, Task 3: RWQCB Section 401 Water Quality Certification for the RGP <br /> A Habitat Mitigation and Monitoring Plan (HMMP)was requested by the RWQCB. WRA will complete the <br /> draft HMMP prepared in a specific format that will specify the methods, interim monitoring, and success <br /> criteria for restoration or enhancement efforts to offset impacts from the proposed project. A limited <br /> amount of time, up to 6 hours, is included in this task to advise on mitigation site identification. If additional <br /> time is needed for site identification, a change order may be necessary. The draft plan will be submitted <br /> to the RWQCB for initial comment, and then revised based on comments received. This task includes up <br /> to two rounds of comments from the RWQCB on the HMMP prior to finalizing for submittal. The HMMP <br /> 2169-G East Francisco Blvd, San Rafael, CA 94901 (415)454-8868 info@wra-ca.com www.wra-ca.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.