BID SUMMARY
<br /> SYCAMORE AND FOOTHILL RESERVOIR RESIDUAL CONTROL SYSTEM PROJECT-CIP 20156
<br /> Unit of #1 #2 #3 #4
<br /> Item No. Quantity Item Description Engineers Estimate Aztec Consultants,
<br /> IApproxinetel Measure Cazadoro Construction,Inc. Auburn Constructors,LLC Pacific Infrastructure Corp
<br /> Inc.
<br /> I I LS Mobilization/Demobilization $10,000 $73,000 $75,300 $50,000 $59,000
<br /> I.S Temporary Excavation Support $2,000 $5,000 $5,000 $3,000 $2,000
<br /> Procurement of Residual
<br /> 1 LS Control Systems per Section 5630,000 $520,000 $540,000 $525,000 $590,400
<br /> 11822
<br /> Installation of Residual Control
<br /> 4 I LS System,mixer,and piping at $80,000 $140,000 $136,500 $200,000 $104,500
<br /> the Foothill Reservoir Site
<br /> Electrical work at Foothill
<br /> 5 1 LS Reservoir not included in bid $105,000 5130,000 $144,000 $100,000 $130,700
<br /> item 4
<br /> Installation of Residual Control
<br /> i, I LS System,mixer,and piping at $80,000 5138,000 $139,500 $235,000 $115,000
<br /> the Sycamore Reservoir Site
<br /> Electrical work at Sycamore
<br /> 7I LS Reservoir not included in bid $95,000 $160,000 $184,000 $145,000 $158,700
<br /> item 6
<br /> LS Commissioning of $3,000 $5,000 $25,000 $5,000 $12,400
<br /> Equipment/Systems
<br /> ,, LS Fencing Systems at Foothill $195,000 $300,000 $273,000 $271,000 $379,000
<br /> and Sycamore Reservoirs.
<br /> TOTAL $1,200,000 $1,471,000 $1,522,300 $1,534,000 $1,551,700
<br /> w..,W., Redwood Painting Stockton Fence&Material Co Redwood Painting Pisor Fence
<br /> Oliveira Fence B&M Builders Inc. SD Electric Con I.Franke
<br /> Con J.Franke Elect Redwood Painting Co.,Inc. Crusader Fence Co. Jeffco _
<br /> Advanced Data Communications,Inc.
<br /> D
<br /> D
<br /> n
<br /> E
<br /> m
<br /> 2
<br /> --I
<br /> . 1of2
<br />
|