Laserfiche WebLink
Item No. Quantity Unit of Item Description <br /> (Approximate) Measure <br /> 1 1 LS Mobilization/Demobilization #5 #6 97 #8 <br /> Anderson Pacific Engineering <br /> 2 1 LS Temporary Excavation Support GSE Construction Company Inc. Construction,Inc. Fort Bragg Electric,Inc. Sabot Inc. <br /> Procurement of Residual <br /> 3 1 LS Control Systems per Section $70,000 $60,000 $66,654 $135,000 <br /> 11822 <br /> Installation of Residual Control <br /> 4 1 LS System,mixer,and piping at $100 2,000 $41,214 $56,000 <br /> the Foothill Reservoir Site <br /> Electrical work at Foothill <br /> I LS Reservoir not included in bid $569,400 $610,000 $652,891 $549,000 <br /> item 4 <br /> Installation of Residual Control <br /> I, I LS System,mixer,and piping at $185,000 $180,000 $220,356 $390,000 <br /> ., the Sycamore Reservoir Site <br /> Electrical work at Sycamore <br /> I LS Reservoir not included in bid $145,000 $185,000 $276,066 $198,000 <br /> item 6 <br /> 1 <br /> 8 I LS Commissioning of $190,000 5195,000 $159,860 $295,000 <br /> Equipment/Systems <br /> 9 I LS Fencing Systems at Foothill $165,000 5170,000 $151,692 $358,000 <br /> and Sycamore Reservoirs. <br /> TOTAL $10,000 $12,000 $28,997 $41,000 <br /> $260,000 $295,000 $304,551 $421,000 <br /> $1,594,500 $1,709,000 $1,902,281 $2,443,000 <br /> Subcontractors Redwood Painting&Coating Inc. Redwood Painting Underwater Resources Inc. Full Service elec <br /> Con J.Franke Elect Stockton Fence&Material Co Redwood Painting Co Inc. DRS Marine Inc. <br /> Stockton Fence&Material Co Olivera Fence Inc Jeffco Painting and Coating Inc. <br /> California Commercial Fence <br /> 2 oft <br />