My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
021621
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 12:52:59 PM
Creation date
2/10/2021 12:52:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/16/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> SYCAMORE AND FOOTHILL RESERVIOR RESIDUAL <br /> CONTROL SYSTEM PROJECT <br /> ENGINEERING SERVICES DURING CONSTRUCTION <br /> BACKGROUND <br /> This scope of work defines the bid phase and engineering services during construction(ESDC)for the <br /> Sycamore and Foothill Reservoir Residual Control System Project(Project).This scope of work is based on <br /> the general assumptions listed below and the assumptions included in each task. <br /> General Assumptions: <br /> 1. This scope of work does not include construction management services.We assume the City will <br /> provide construction management services. <br /> 2. City will advertise the project for contractor bids.The City will lead the responses to Contractor <br /> questions and Carollo will provide technical support. <br /> 3. Project duration will be eight(8)months from the Notice to Proceed. <br /> SCOPE OFWORK <br /> Task 1.0 - Project Management <br /> Task 1.1-Project Administration <br /> Carollo will provide project administration and management necessary to perform planning,execution, <br /> monitoring,sub-consultant coordination,and reporting of the Project.Carollo will prepare a monthly <br /> progress letter report for attachment to the monthly invoice to track and report status of budget <br /> expenditures and key work products completed during that billing period. <br /> Task 1.0-Assumptions <br /> 1. The duration of the construction will be eight(8)months from the City issuing the Notice to Proceed. <br /> Task 2.0 - Bid Phase <br /> Task 2.1-Assist with Bidder Questions <br /> Carollo will assist the City with answering bidder questions during the bid period. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.