Laserfiche WebLink
Joint Tri-Valley Potable Reuse Technical Feasibility Study I ES TRI-VALLEY WATER AGENCIES <br /> TECHNICAL TASKS` Vr I Yr 2 Yr 3 Yr a <br /> Demand and Supply Studies <br /> Technical Studies <br /> Independent Advisory Pane! <br /> Demonstration Facility <br /> t QA 111111111 <br /> Permitting/Fngineers Report —� <br /> Pre Design Mil <br /> Final Design <br /> Rid and Award AWN.construction ^y <br /> AWPF Construction <br /> Slat t Lip/Commissioning <br /> 'Tasks in italics are needed only if a project is selected for implementation, <br /> Figure ES.8 Potential Next Steps: Conceptual Timeline <br /> C FINAL MAY 2018 j 15 <br />