My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
011921
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 4:49:45 PM
Creation date
1/11/2021 4:49:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/19/2021
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
installation. Staff recommends approving Amendment No. 1 with CSI, increasing the <br /> contract by $2,505.11 for a total not-to-exceed amount of $102,458 for the additional <br /> inspection services (see Attachment 2). <br /> MurraySmith, formerly a part of Quincy Engineering, provided construction support <br /> services for the project. These services included reviewing shop drawings and other <br /> submittals, providing responses to requests for information during construction, and <br /> conducting the pre-sandblast and post-sandblast inspections needed to identify all <br /> required metal repairs on all three tank interiors. In addition, their subcontractors <br /> reviewed the installation and start-up of the temporary variable-frequency drive pumping <br /> system. They also monitored the cathodic protection system installation and performed <br /> post installation system checks to ensure it was working correctly. <br /> Staff recommends acceptance of the project by City Council as the work by Olympus <br /> and Associates, Inc. is complete to the Director of Engineering's satisfaction. <br /> Submitted by: Reviewed by: Approved <br /> (41 <br /> /C/6 - <br /> Stephen Ki . •atrick Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Attachments: <br /> 1 . Funding and Expenditure Summary <br /> 2. CSI Services, Inc. Contract Amendment No. 1 <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.