Laserfiche WebLink
WAYCROSS CT KOLLN ST END 400 33 15,402 <br /> CRISFIELD LANE KOLLN ST END 470 33 17,712 <br /> DUNDALK CT KOLLN ST END 360 33 14,082 <br /> COTTERELL CT CRISFIELD LANE END 236 29 9,358 <br /> MAIRMONT DR KOLLN ST VALDOSTA CT 475 33 17,877 <br /> LIGHTLAND CT MARIMOUNT DR END 162 29 7,212 <br /> HAZELHURST CT KOLLN ST END 516 33 19,230 <br /> HAYFORD CT KOLLN ST END 112 48 6,408 <br /> MORGANFIELD CT KOLLN ST END 520 33 19,362 <br /> MORGANFIELD RD SANTA RITA RD KOLLN ST 858 37 31,746 <br /> RENNELWOOD WAY KOLLN ST KOLLN ST 1,374 29 39,846 <br /> (SOUTH) (NORTH) <br /> PEREGRINE WAY KOLLN ST KOLLN ST 1,374 38 52,212 <br /> (SOUTH) (NORTH) <br /> GARATTI CT KOLLN ST END 545 33 20,187 <br /> CRISTOBAL WAY SANTA RITA RD ALVARADO ST 1,161 33 38,313 <br /> (FRONTAGE) <br /> CID WAY ALVARADO ST KOLLN ST 1,034 33 34,122 <br /> NEVIS ST SANTA RITA RD KOLLN ST 1,046 33 34,518 <br /> (FRONTAGE) <br /> WELLS ST SANTA RITA RD NEVIS ST 620 33 20,460 <br /> (FRONTAGE) <br /> KOLLN ST NEVIS ST NORTH END 1,746 37 64,602 <br /> VALLEY AVE HOPYARD RD <br /> SA <br /> RITA 6,742 61 411,262 <br /> RAVEN RD GREENWOOD RD GREENWOOD 2,590 37 95,830 <br /> (SOUTH) RD(NORTH) <br /> HUMMINGBIRD RD CRESTLINE RD RAVEN RD 1,403 33 46,299 <br /> CANARY DR RAVEN RD GREENWOOD 931 33 30,723 <br /> LIN GATE ST SUTTERGATE AVE END 794 33 29,063 <br /> SILVER ST SANTA RITA RD KOLLN ST 1197 33 39,495 <br /> (FRONTRAGE) <br /> BLACKBIRD WAY WOODTHRUSH DR WOODTHRUSH 1,246 33 41,118 <br /> (SOUTH) DR(NORTH) <br /> MINIVET CT BLACKBIRD DR END 288 33 11,706 <br /> MALLARD DR BLACKBIRD DR CRESTLINE RD 875 37 32,375 <br /> SANDERLING DR WOODTHRUSH DR RAVEN RD 746 33 24,618 <br /> MCHENRY GATE WAY MOHR AVE AVE SUTTERGATE 1,308 33 43,164 <br /> MOHR AVE McHENRY GATE ROSS GATE 1,067 38 40,546 <br /> WAY WAY <br /> MOHR AVE ROSS GATE WAY DR ODTHRUSH 203 38 7,714 <br /> Funding for this project totaled $765,000 as outlined in Attachment 1. Expenditures <br /> totaled $633,502, leaving a remaining balance of$131,498. Staff recommends the <br /> transfer of the remaining balance to the Gas Tax Fund 160. <br /> The project as awarded included slurry sealing streets within the Sutter Gate area that <br /> were to be disturbed by PG&E's replacement of direct-buried electrical lines. PG&E <br /> provided a payment in the amount of$90,000 for the slurry seal placement based on <br /> the square footage of streets where they were working. The payment was required as <br /> part of the encroachment permit issued to PG&E to work in the streets which had <br /> recently been re-paved. However, as PG&E completed their work, several of the streets <br /> had minimal disturbance, so the slurry seal work was deferred to ensure the PG&E work <br /> did not require additional street surface cuts and to limit the interruptions to the <br /> Page 3 of 4 <br />