My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
111720
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 2:49:15 PM
Creation date
11/12/2020 2:49:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/17/2020
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fExhibitA <br /> MEMORANDUM <br /> To: Matt Gruber, City Landscape Architect, City of Pleasanton <br /> From: Ed Armstrong, Senior Habitat Restoration Specialist/Landscape Architect, Dudek <br /> Subject: Reduced Scope of Work for Augustin Bernal Mountain Bike Trail Design Services <br /> Date: 10/1/2020 <br /> cc: Katherine Waugh, Dudek <br /> Hi Matt, <br /> Thank you for the opportunity to support the City through preparation of Plans,Specifications and Estimates(PS&Es) <br /> for the Augustin Bernal Mountain Bike Trail. We are excited to be considered for additional work on this park <br /> amenity. Our scope is based upon our conference call on 9/16/2020, the previous scope of work prepared by <br /> Action Sports Construction, input from you on our Scope of Work outline, and feedback on our original scope and <br /> cost. Please contact me if you have any questions or would like us to make additional modifications to this scope. <br /> 1 Meetings and Coordination <br /> 1.1 Background Research <br /> Dudek will review background documents relevant to design of the trail, including, but not limited to, existing <br /> topography,aerial photography,survey/as-built data for the parking lot at the end point,GPS data for the unofficial <br /> trail alignment,and mountain bike trail guidelines from the International Mountain Bicycling Association(IMBA)and <br /> other organizations. We will prepare a base map as well as load background data onto a Trimble GPS unit for use <br /> in the site visit. <br /> 1.2 Meetings <br /> To initiate the project, Dudek will conduct a Kickoff Meeting and Site Assessment.We suggest a location in the park <br /> that allows for appropriate social distancing for the Kickoff Meeting. Items of discussion should include a review of <br /> the existing trail alignment,the City's goals for the project, potential issues that could arise during CEQA that might <br /> be eliminated in the design phase,the proposed schedule,strategies for gaining HOA approval for the project, and <br /> other topics. For efficiency, the kickoff meeting could occur in conjunction with the kickoff meeting for the CEQA <br /> work. <br /> Following the meeting, we will tour the site with the City's Project Manager to GPS the existing trail, identify the <br /> segment (or segments) of the trail that need realignment, identify and GPS the proposed alignment, discuss <br /> potential new features, record locations for signage, note any environmental issues (drainage crossings, sensitive <br /> vegetation, active erosion locations, etc.), and examine the connection to the parking lot at the bottom and the <br /> existing trail at the top. The GPS data will be differentially corrected at the office for use in the construction <br /> P220397 <br /> D U D E K 1 October 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.