Laserfiche WebLink
54. CONSTRUCTION PER CITY STANDARDS: All public improvements shall be <br /> constructed in compliance with the City Standard Specifications and Details in effect at <br /> the time of the issuance of the encroachment, grading, or subdivision permit, whichever <br /> occurs first. <br /> 55. GEOTECHNICAL CONSULTANT— CERTIFICATION OF CONSTRUCTION OF <br /> SUBDIVISIONS: The applicant's California licensed geotechnical engineer shall inspect <br /> and approve the construction of all foundations, retaining walls, drainage and <br /> geotechnical aspects of the development to ensure compliance with the approved <br /> grading and improvement plans. The geotechnical engineer shall be present on site <br /> during grading and excavation operations and certify on the as-built plans that the <br /> inspection results and the as-built conditions of the development were constructed in <br /> general compliance with the project geotechnical report and improvement plans. The <br /> results of the inspections shall be submitted to the Director of Engineering/City Engineer <br /> prior to the issuance of the certificate of occupancy. The applicant shall bear all costs for <br /> work related to this condition by their geotechnical engineer. <br /> 56. ENCROACHMENT AND HAUL ROUTE PERMITS: The applicant's contractor shall <br /> obtain an encroachment and haul route permit from the Engineering Department prior to <br /> moving equipment to the project site or performing work in the public right of way or <br /> within public easements. The applicant's contractor shall submit a completed and signed <br /> encroachment permit application accompanied with six copies of City-approved <br /> improvement plans, proof of insurance with endorsement adding the City as an <br /> additional insured, a copy of a valid City of Pleasanton business license, applicable fees, <br /> and other requirements determined by the Director of Engineering/City Engineer. <br /> 57. RIGHT OF ENTRY: The applicant shall furnish written proof of all necessary rights-of- <br /> entry, permits and/or easements for the construction of off-site temporary or permanent <br /> improvements to the Director of Engineering/City Engineer prior to the issuance of the <br /> encroachment, grading, or subdivision permit, whichever occurs first. <br /> 58. DAMAGE TO EXISTING PUBLIC AND PRIVATE IMPROVEMENTS: The applicant shall <br /> repair damage to existing public and private improvements on and near the project site <br /> and along the haul route at their full expense caused by construction activities as <br /> determined and to the satisfaction of the Director of Engineering/City Engineer and prior <br /> to the City Council acceptance of public improvements. <br /> 59. AS-BUILT DRAWINGS: The applicant's California licensed civil engineer shall submit <br /> signed and stamped as-built drawings and AutoCAD files for the construction of the <br /> public improvements and stormwater treatment system subject to the review and <br /> approval of the Director of Engineering/City Engineer and prior to the release of the <br /> performance and labor and materials bond. <br /> Utilities <br /> 60. SEPTIC TANKS: The applicant shall abandon all existing on-site septic tanks or holding <br /> tanks in compliance with the Alameda County Department of Health Services <br /> requirements prior to issuance of the encroachment, grading, or subdivision permit, <br /> whichever occurs first, unless otherwise approved by the Director of Engineering/City <br /> Engineer. <br /> PUD-135 City Council <br /> Page 11 of 23 <br />