f. No stockpiling/storage of construction materials, fill, etc., shall take place underneath <br /> or within 5-feet of the dripline of the existing trees. <br /> g. No equipment or temporary structures shall be placed within or beneath the dripline of <br /> the existing trees. <br /> Failure to comply with these requirements may result in a "stop work order." <br /> TRAFFIC ENGINEERING DIVISION — 925-931-5677 <br /> 28. TRAFFIC IMPACT FEES: Traffic Engineering may monitor trip generation during preschool <br /> operation at the project site, as warranted. Should Traffic Engineering observe additional trips <br /> during its observations in the PM peak hours, the City Traffic Engineer may require the applicant <br /> to pay for a trip generation "after study" to be completed by the City's on-call transportation <br /> consultant. If the trip generation "after study" is reflective of the applicant's August 14, 2020 <br /> narrative no further action will be needed. If the trip generation is greater than what was stated in <br /> the narrative, the applicant shall be required to pay the City's Traffic Impact Fees associated with <br /> the additional trips upon receipt of a written notice from the City and/or have their use permit <br /> brought back to Planning Commission for subsequent review (Project Specific Condition) <br /> BUILDING AND SAFETY DIVISION — 925-931-5300 <br /> 29. BUILDING AND FIRE CLEARANCE: Prior to issuance of a business license, the applicant shall <br /> contact the Building and Safety Division and the Fire Department to ensure the proposed use of <br /> the tenant space meets Building and Fire Code requirements. If required, the applicant shall <br /> obtain all appropriate City permits. <br /> [end] <br /> P20-0740 and P20-0741 Planning Commission <br /> Page 5 of 5 <br />cash, letter of credit, or other security satisfactory to the Director of <br /> Engineering/City Engineer, for all Heritage Trees and any other significant tree as deemed by the <br /> City Landscape Architect. This bond or security will be for the value of the tree, up to a maximum <br /> of $25,000, and shall be held for a minimum of 1 year following acceptance of public <br /> improvements of completion of construction, whichever is later, and shall be forfeited if the trees <br /> are destroyed or substantially damaged. An arborist shall be onsite during any tree work (i.e. root <br /> pruning, trimming, setting up tree protection. etc.). The bond or security may be released early <br /> with a certification letter by the arborist confirming he/she was present during said tree work and <br /> work was performed in accordance with the arborist's recommendations. <br /> 27. PROJECT PLANS: The following statements shall be printed on the demolition, grading and <br /> landscape plans where applicable to the satisfaction of the City Landscape Architect prior to <br /> issuance of building permits: <br /> a, No existing tree may be trimmed or pruned without prior approval by the City <br /> Landscape Architect. <br /> b. Utilize best efforts to locate any new utility trenches outside of the existing canopy of <br /> the trees to be saved. If this is not feasible, the applicant shall submit a report from a <br /> certified arborist acceptable to the City indicating trenching will not be detrimental to <br /> the health of the tree. <br /> c. Nothing may be stored within the dripline of the tree canopies. This includes <br /> equipment, oil, gas, chemicals, harmful materials, fill or storage. <br /> d. No oil, gasoline, chemicals, or other harmful materials shall be deposited or disposed <br /> within the dripline of the trees or in drainage channels, swales, or areas that may lead <br /> to the dripline. <br /> e. No sign, wires, or ropes shall be attached to the trees. <br /> P20-0740 and P20-0741 Planning Commission <br /> Page 4 of 5 <br />