Laserfiche WebLink
EXHIBIT A <br />relQUINNCY <br />ENGIEERING <br />July 12,2020 <br />Mr. Adam Nelkie, P.E. <br />Senior Civil Engineer <br />City of Pleasanton <br />Engineering Department <br />200 Old Bernal Road <br />P.O. Box 520 <br />Pleasanton, CA 94566 <br />Re: Additional Scope of Work and Fee Amendment for Hopyard and Owens Intersection <br />Improvements PS&E <br />Dear Mr. Nelkie: <br />I am sending you this request for an amendment to our contract to include out of scope of work for the <br />Hopyard and Owens Intersection Improvements project along with brief descriptions of the performed <br />and pending out of scope items. <br />While this is not a complex design project, the multiple iterations of the bike facility types and lane <br />widths required multiple redesigns of a significant portion of the project elements. The cost for the <br />additional scope items, including work already completed, as outlined in the attachment shall not <br />exceed $ 99,430 and will be billed on a time and materials basis pursuant to our approved Quincy <br />services agreement with the City of Pleasanton. <br />Earlier this year, we advanced some of the 95% redesign and plan updates to widen the southbound left <br />turn lanes to 11' per Caltrans comment and incorporated redlines provided by the City on the original <br />95% submittal. We were not expecting Caltrans to respond unfavorably to the modifications the City <br />and Quincy came up with to achieve the 11' left turn lane widths. Upon receiving unfavorable <br />comments on the latest Design Standard Decision Document submittal requesting that we revise the <br />bike facility widths, some of the work we have done to update the plans will need to be redone. In <br />hindsight, we should have waited to receive comments back from Caltrans on the resubmitted DSDD <br />before proceeding with plan updates. Quincy can withhold 40 hours of design/drafting time on that <br />effort already completed for a fee reduction of $5000, representing the cost of reconfiguring the lane <br />widths and updating the curb profiles and construction cross sections. This fee reduction has been <br />applied to our amendment request. <br />Thank you for the opportunity to work on this project and please let us know if there is anything <br />regarding this the additional scope items or costs you would like to discuss. <br />Sincerely, <br />Quincy Engineering, Inc. <br />Michele Johnson, P.E. <br />Project Manager <br />developing YOUf? vision delivering YOUR project <br />