My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
090120
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2020 4:41:49 PM
Creation date
8/27/2020 9:09:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE <br />Work can begin upon execution of this Change Order. <br />STAFFING <br />Leslie Lazarotti will be the principal in charge of the project. Elan Alford will be the project manager. <br />Other staff will be assigned to the project as necessary. <br />ASSUMPTIONS <br />Any fees associated with permit applications are not included. <br />WRA has designed this scope to cover other anticipated permit conditions that may be required. <br />However, the full extent of these conditions are not known at this time and additional scope of <br />work may be found to be required to fulfill all permit obligations. <br />LIMITATIONS <br />WRA will work with the regulatory agencies as much as possible to facilitate timely processing of the <br />permit applications by the regulatory agencies and to coordinate with them on permit conditions that may <br />affect Project feasibility, cost, and construction schedule. WRA cannot control the ultimate <br />determinations of the regulatory agencies, the duration necessary to process those permits, or the <br />contents of all requirements that may appear in the final permits. <br />ESTIMATED COST <br />The estimated cost for the services described in this Change Order is provided below. This cost is based <br />on the assumptions above and in the original Scope of Work. Costs may be reallocated between tasks, <br />but the total cost will not be exceeded without authorization. <br />TERMS AND CONDITIONS <br />This Change Order is subject to WRA's Standard Terms and Conditions as incorporated in the original <br />Scope of Work, dated June 20, 2019. <br />(Approval/ Signature Page Follows) <br />Change Order City of Pleasanton Stream and Pond Maintenance — Project 29118 — July 2020 <br />3 <br />Task <br />Cost <br />Phase 1. Task 2D. Final IS/MND <br />$ 13,000 <br />Phase 2. Task 2. <br />Prepare a Corps Regional General Permit Application <br />$ 1,000 <br />Phase 2. Task 3. <br />RWQCB Section 401 Water Quality Certification <br />$ 2,000 <br />Phase 2. Task 4. <br />ESA Formal Consultation. <br />$ 10,000 <br />Phase 2. Task 5. <br />CDFW Streambed Alteration <br />$ 2,000 <br />Phase 2. Task 6. <br />Regulatory Agency Coordination. <br />$ 8,000 <br />Phase 2. Task 7. <br />Project Management <br />$ 2,000 <br />Total: <br />$38,000 <br />TERMS AND CONDITIONS <br />This Change Order is subject to WRA's Standard Terms and Conditions as incorporated in the original <br />Scope of Work, dated June 20, 2019. <br />(Approval/ Signature Page Follows) <br />Change Order City of Pleasanton Stream and Pond Maintenance — Project 29118 — July 2020 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.