My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
061620
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 11:02:47 AM
Creation date
6/11/2020 11:02:45 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2020
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City's on-call contractor, Econolite, will purchase and install video equipment to <br /> detect traffic movement at the intersection of Santa Rita Road and Mohr Avenue, which <br /> currently does not have a traffic camera, for a total cost of$10,324. <br /> To prevent tree damage by construction equipment, tree trimming is needed throughout <br /> the project area. The City's on-call tree service contractor, West Coast Arborists, Inc., <br /> submitted a proposal to the Parks Department to provide tree trimming services for a <br /> not-to-exceed amount of $54,834. <br /> Pavement condition information is needed to assist staff in developing the Street <br /> Resurfacing Program. The City of Pleasanton has applied and qualified for $51,360 in <br /> funds from the Pavement Management Technical Assistance Program (P-TAP) Round <br /> 21 Grant. This P-TAP grant is derived from Federal Highway funds administered by <br /> MTC. In order to obtain this P-TAP grant, the City of Pleasanton must pay a local match <br /> amount of$12,840 to MTC (20 percent local match). This local match amount was <br /> included under this Annual Street Resurfacing, CIP 20503, budget. <br /> Budget <br /> Project funding totals $3.1 million dollars with $27,788 expended to date. The total <br /> estimated project expenditure is $4,544,390 leaving a project shortfall of $1,444,390. <br /> The estimated total expenditure includes a construction contingency of approximately 13 <br /> percent of the construction contract ($504,670), and consultant/specialty services as <br /> outlined above. See Attachment 1 for the Funding and Estimated Expenditure Summary. <br /> This project is an annual project funded as part of the 2020/21 CIP with a total funding <br /> amount of$3.1 million. Funding for this project includes Gas Tax, Measure B/BB, <br /> Measure F, and Streets CIP funds. Staff recommends the following transfers and <br /> allocations to the project to cover the project shortfall of $1,444,390: <br /> 1) Transfer $135,000 from the Annual Street Slurry Seal Project, CIP No. 20504, to <br /> partially cover the preparatory work for the slurry seal project. <br /> 2) Transfer $250,000 from the Annual Sidewalk & Intersection Ramp (ADA) Project, <br /> CIP No. 20505. <br /> 3) Allocate $500,000 from the Measure F fund (Fund 166). <br /> 4) Allocate $559,390 from the Streets CIP fund, (Fund 211). Staff recommends the <br /> allocation and transfer of a total of $1,444,390 from various funding sources as <br /> outlined in the recommendations to complete funding for this project. <br /> Schedule <br /> The proposed schedule for the project is as follows: <br /> Approval of Plans and Specifications and Award of Contract: June 16, 2020 <br /> Start of Construction: July 12, 2020 <br /> End of Construction: December 31, 2020 <br /> Page 6 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.