Laserfiche WebLink
KOLLN ST NEVIS ST NORTH END 1,746 37 64,602 <br /> VALLEY AVE HOPYARD RD SANTA RITA 6,742 61 411,262 <br /> RD <br /> SUTTER GATE AVE MOHR AVE END 625 38 24,175 <br /> JONES GATE CT SUTTERGATE AVE END 312 29 11,562 <br /> SMITH GATE CT MOHR AVE END 260 29 10,054 <br /> KNOX GATE CT MOHR AVE END 256 29 9,938 <br /> FUNSTON GATE CT MOHR AVE END 274 29 10,460 <br /> ROSS GATE CT MOHR AVE END 157 29 7,067 <br /> HARTLEY GATE CT LIN GATE ST END 412 33 15,798 <br /> LIN GATE CT LIN GATE ST END 272 33 11,178 <br /> LIN GATE ST SUTTERGATE AVE END 794 33 28,404 <br /> LARAMIE GATE CIR SUTTERGATE AVE 90 DEGREE 757 33 25,000 <br /> (NORTH) TURN <br /> SHEARWATER RD GREENWOOD RD TANAGER DR 815 37 30,155 <br /> GREENWOOD RD FOXSWALLOW RD RAVEN RD 606 33 20,000 <br /> RAVEN RD GREENWOOD RD GREENWOOD 2,590 37 95,830 <br /> (SOUTH) RD(NORTH) <br /> HUMMINGBIRD RD CRESTLINE RD RAVEN RD 1,403 33 46,299 <br /> CANARY DR RAVEN RD GREENWOOD 931 33 30,723 <br /> SKYLARK CT SKYLARK WAY END 160 29 7,154 <br /> SKYLARK WAY WOODTHRUSH DR WOODTHRUSH 1,500 33 49,500 <br /> (WEST) DR(EAST) <br /> BLACKBIRD WAY WOODTHRUSH DR WOODTHRUSH 1,246 33 41,118 <br /> (SOUTH) DR(NORTH) <br /> MINIVET CT BLACKBIRD DR END 288 33 11,706 <br /> MALLARD DR BLACKBIRD DR CRESTLINE RD 875 37 32,375 <br /> SANDERLING DR WOODTHRUSH DR RAVEN RD 746 33 24,618 <br /> MCHENRY GATE WAY MOHR AVE AVETERGATE 1,308 33 43,164 <br /> MOHR AVE McHENRY GATE ROSS GATE 1,067 38 40,546 <br /> WAY WAY <br /> MOHR AVE ROSS GATE WAY WOODTHRUSH 203 38 7,714 <br /> Bids <br /> Sealed bids for this project were virtually opened on May 27, 2020. There were three <br /> bids received, ranging from the low bid amount of$3,882,081 to $4,157,546. The low <br /> bid amount is approximately 2 percent lower than the Engineer's Estimate of$3,943,475 <br /> (see Attachment 3). Past work performed by Bay Cities Paving & Grading, Inc. was <br /> verified to be satisfactory. Staff recommends award of the construction contract to the <br /> lowest responsible bidder, Bay Cities Paving & Grading, Inc., for $3,882,081. <br /> Consultant/Specialty Services: <br /> Consulting testing services for $30,000 will be provided under the City's existing on-call <br /> materials testing contracts. The testing services are required to provide specialty testing <br /> of the materials and density checks in conformance with the City's Quality Assurance <br /> Program for paving. <br /> In order to meet the project milestones, a specialty engineering service was needed to <br /> complete the design. The City's on-call consultant, Carlson Management, Inc., was <br /> selected to provide pavement repair assessment services for a proposed not-to-exceed <br /> amount of$40,112. Another on-call consultant, Pakpour Consulting Group, was <br /> selected to provide engineering support for a total cost $7,634. <br /> Page 5 of 7 <br />