KOLLN ST NEVIS ST NORTH END 1,746 37 64,602
<br /> VALLEY AVE HOPYARD RD SANTA RITA 6,742 61 411,262
<br /> RD
<br /> SUTTER GATE AVE MOHR AVE END 625 38 24,175
<br /> JONES GATE CT SUTTERGATE AVE END 312 29 11,562
<br /> SMITH GATE CT MOHR AVE END 260 29 10,054
<br /> KNOX GATE CT MOHR AVE END 256 29 9,938
<br /> FUNSTON GATE CT MOHR AVE END 274 29 10,460
<br /> ROSS GATE CT MOHR AVE END 157 29 7,067
<br /> HARTLEY GATE CT LIN GATE ST END 412 33 15,798
<br /> LIN GATE CT LIN GATE ST END 272 33 11,178
<br /> LIN GATE ST SUTTERGATE AVE END 794 33 28,404
<br /> LARAMIE GATE CIR SUTTERGATE AVE 90 DEGREE 757 33 25,000
<br /> (NORTH) TURN
<br /> SHEARWATER RD GREENWOOD RD TANAGER DR 815 37 30,155
<br /> GREENWOOD RD FOXSWALLOW RD RAVEN RD 606 33 20,000
<br /> RAVEN RD GREENWOOD RD GREENWOOD 2,590 37 95,830
<br /> (SOUTH) RD(NORTH)
<br /> HUMMINGBIRD RD CRESTLINE RD RAVEN RD 1,403 33 46,299
<br /> CANARY DR RAVEN RD GREENWOOD 931 33 30,723
<br /> SKYLARK CT SKYLARK WAY END 160 29 7,154
<br /> SKYLARK WAY WOODTHRUSH DR WOODTHRUSH 1,500 33 49,500
<br /> (WEST) DR(EAST)
<br /> BLACKBIRD WAY WOODTHRUSH DR WOODTHRUSH 1,246 33 41,118
<br /> (SOUTH) DR(NORTH)
<br /> MINIVET CT BLACKBIRD DR END 288 33 11,706
<br /> MALLARD DR BLACKBIRD DR CRESTLINE RD 875 37 32,375
<br /> SANDERLING DR WOODTHRUSH DR RAVEN RD 746 33 24,618
<br /> MCHENRY GATE WAY MOHR AVE AVETERGATE 1,308 33 43,164
<br /> MOHR AVE McHENRY GATE ROSS GATE 1,067 38 40,546
<br /> WAY WAY
<br /> MOHR AVE ROSS GATE WAY WOODTHRUSH 203 38 7,714
<br /> Bids
<br /> Sealed bids for this project were virtually opened on May 27, 2020. There were three
<br /> bids received, ranging from the low bid amount of$3,882,081 to $4,157,546. The low
<br /> bid amount is approximately 2 percent lower than the Engineer's Estimate of$3,943,475
<br /> (see Attachment 3). Past work performed by Bay Cities Paving & Grading, Inc. was
<br /> verified to be satisfactory. Staff recommends award of the construction contract to the
<br /> lowest responsible bidder, Bay Cities Paving & Grading, Inc., for $3,882,081.
<br /> Consultant/Specialty Services:
<br /> Consulting testing services for $30,000 will be provided under the City's existing on-call
<br /> materials testing contracts. The testing services are required to provide specialty testing
<br /> of the materials and density checks in conformance with the City's Quality Assurance
<br /> Program for paving.
<br /> In order to meet the project milestones, a specialty engineering service was needed to
<br /> complete the design. The City's on-call consultant, Carlson Management, Inc., was
<br /> selected to provide pavement repair assessment services for a proposed not-to-exceed
<br /> amount of$40,112. Another on-call consultant, Pakpour Consulting Group, was
<br /> selected to provide engineering support for a total cost $7,634.