In 2019, PG&E replaced several direct-buried electrical lines on several streets within <br /> the Sutter Gate area to address reoccurring electrical outages. The City delayed <br /> scheduled slurry seal work in the area to allow for completion of the PG&E work. PG&E <br /> reimbursed the City $90,000 to slurry seal the streets disturbed by PG&E and not <br /> already scheduled for slurry seal placement. <br /> A task authorization in the amount of$16,315 will be issued to the City's on-call <br /> consultant, Geocon, Inc., for material testing and inspection of the slurry seal materials <br /> as part of the City's Quality Assurance Program. <br /> Schedule <br /> The start of construction will begin in August after completion of the preparatory base <br /> repair and crack sealing work that is part of the upcoming Annual Street Pavement <br /> Resurfacing CIP. The August start also will ensure that the material is being placed <br /> during the most ideal temperature conditions for rapid curing. <br /> The anticipated schedule for the project is as follows: <br /> Approval of Plans & Specifications and Award of Contract: June 16, 2020 <br /> Start of Construction: August 2020 <br /> End of Construction: October 2020 <br /> Submitted by: / Fiscal Review: Approved by: <br /> (, - <br /> kik, <br /> -' k ' / .n . <br /> Stephen Kirkpatrick Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Attachments: <br /> 1. Funding and Estimated Expenditure Summary <br /> 2. Bid Summary <br /> 3. Map of Streets <br /> Page 4 of 4 <br />