NEVIS ST SANTA RITA RD KOLLN ST 1,046 33 34,518
<br /> (FRONTAGE)
<br /> WELLS ST SANTA RITA RD NEVIS ST 620 33 20,460
<br /> (FRONTAGE)
<br /> KOLLN ST NEVIS ST NORTH END 1,746 37 64,602
<br /> VALLEY AVE HOPYARD RD SARITA 6,742 61 411,262
<br /> SUTTER GATE AVE MOHR AVE END 625 38 24,175
<br /> JONES GATE CT SUTTERGATE AVE END 312 29 11,562
<br /> SMITH GATE CT MOHR AVE END 260 29 10,054
<br /> KNOX GATE CT MOHR AVE END 256 29 9,938
<br /> FUNSTON GATE CT MOHR AVE END 274 29 10,460
<br /> ROSS GATE CT MOHR AVE END 157 29 7,067
<br /> HARTLEY GATE CT LIN GATE ST END 412 33 15,798
<br /> LIN GATE CT LIN GATE ST END 272 33 11,178
<br /> LIN GATE ST SUTTERGATE AVE END 794 33 28,404
<br /> LARAMIE GATE CIR SUTTERGATE AVE 90 DEGREE 757 33 25,000
<br /> (NORTH) TURN
<br /> SHEAR WATER RD GREENWOOD RD TANAGER DR 815 37 30,155
<br /> GREENWOOD RD FOXSWALLOW RD RAVEN RD 606 33 20,000
<br /> RAVEN RD GREENWOOD RD GREENWOOD 2,590 37 95,830
<br /> (SOUTH) RD(NORTH)
<br /> HUMMINGBIRD RD CRESTLINE RD RAVEN RD 1,403 33 46,299
<br /> CANARY DR RAVEN RD GREENWOOD 931 33 30,723
<br /> SKYLARK CT SKYLARK WAY END 160 29 7,154
<br /> SKYLARK WAY WOODTHRUSH DR WOODTHRUSH 1,500 33 49,500
<br /> (WEST) DR(EAST)
<br /> BLACKBIRD WAY WOODTHRUSH DR WOODTHRUSH 1,246 33 41,118
<br /> (SOUTH) DR(NORTH)
<br /> MINIVET CT BLACKBIRD DR END 288 33 11,706
<br /> MALLARD DR BLACKBIRD DR CRESTLINE RD 875 37 32,375
<br /> SANDERLING DR WOODTHRUSH DR RAVEN RD 746 33 24,618
<br /> MCHENRY GATE WAY MOHR AVE AVETERGATE 1,308 33 43,164
<br /> MOHR AVE McHENRY GATE ROSS GATE 1,067 38 40,546
<br /> WAY WAY
<br /> MOHR AVE ROSS GATE WAY DR ODTHRUSH 203 38 7,714
<br /> DISCUSSION
<br /> Bids
<br /> Sealed bids for this project were virtually opened on May 5, 2020. There were nine bids
<br /> received, ranging from the low bid amount of$679,033 from VSS International, Inc. to
<br /> $898,922. The low bid is 1.8 percent higher than the Engineer's Estimate of$666,500
<br /> (see Attachment 2).
<br /> Past work performed by VSS International, Inc. was verified to be satisfactory. Staff
<br /> recommends award of the construction contract to VSS International, Inc. of West
<br /> Sacramento, CA.
<br /> Budget
<br /> The project was authorized under the FY 19/20 CIP budget for design and construction
<br /> with an approved budget of$900,000. A total of$810,000 was funded from gas tax
<br /> funding and $90,000 in reimbursement grant funding from PG&E.