Laserfiche WebLink
NEVIS ST SANTA RITA RD KOLLN ST 1,046 33 34,518 <br /> (FRONTAGE) <br /> WELLS ST SANTA RITA RD NEVIS ST 620 33 20,460 <br /> (FRONTAGE) <br /> KOLLN ST NEVIS ST NORTH END 1,746 37 64,602 <br /> VALLEY AVE HOPYARD RD SARITA 6,742 61 411,262 <br /> SUTTER GATE AVE MOHR AVE END 625 38 24,175 <br /> JONES GATE CT SUTTERGATE AVE END 312 29 11,562 <br /> SMITH GATE CT MOHR AVE END 260 29 10,054 <br /> KNOX GATE CT MOHR AVE END 256 29 9,938 <br /> FUNSTON GATE CT MOHR AVE END 274 29 10,460 <br /> ROSS GATE CT MOHR AVE END 157 29 7,067 <br /> HARTLEY GATE CT LIN GATE ST END 412 33 15,798 <br /> LIN GATE CT LIN GATE ST END 272 33 11,178 <br /> LIN GATE ST SUTTERGATE AVE END 794 33 28,404 <br /> LARAMIE GATE CIR SUTTERGATE AVE 90 DEGREE 757 33 25,000 <br /> (NORTH) TURN <br /> SHEAR WATER RD GREENWOOD RD TANAGER DR 815 37 30,155 <br /> GREENWOOD RD FOXSWALLOW RD RAVEN RD 606 33 20,000 <br /> RAVEN RD GREENWOOD RD GREENWOOD 2,590 37 95,830 <br /> (SOUTH) RD(NORTH) <br /> HUMMINGBIRD RD CRESTLINE RD RAVEN RD 1,403 33 46,299 <br /> CANARY DR RAVEN RD GREENWOOD 931 33 30,723 <br /> SKYLARK CT SKYLARK WAY END 160 29 7,154 <br /> SKYLARK WAY WOODTHRUSH DR WOODTHRUSH 1,500 33 49,500 <br /> (WEST) DR(EAST) <br /> BLACKBIRD WAY WOODTHRUSH DR WOODTHRUSH 1,246 33 41,118 <br /> (SOUTH) DR(NORTH) <br /> MINIVET CT BLACKBIRD DR END 288 33 11,706 <br /> MALLARD DR BLACKBIRD DR CRESTLINE RD 875 37 32,375 <br /> SANDERLING DR WOODTHRUSH DR RAVEN RD 746 33 24,618 <br /> MCHENRY GATE WAY MOHR AVE AVETERGATE 1,308 33 43,164 <br /> MOHR AVE McHENRY GATE ROSS GATE 1,067 38 40,546 <br /> WAY WAY <br /> MOHR AVE ROSS GATE WAY DR ODTHRUSH 203 38 7,714 <br /> DISCUSSION <br /> Bids <br /> Sealed bids for this project were virtually opened on May 5, 2020. There were nine bids <br /> received, ranging from the low bid amount of$679,033 from VSS International, Inc. to <br /> $898,922. The low bid is 1.8 percent higher than the Engineer's Estimate of$666,500 <br /> (see Attachment 2). <br /> Past work performed by VSS International, Inc. was verified to be satisfactory. Staff <br /> recommends award of the construction contract to VSS International, Inc. of West <br /> Sacramento, CA. <br /> Budget <br /> The project was authorized under the FY 19/20 CIP budget for design and construction <br /> with an approved budget of$900,000. A total of$810,000 was funded from gas tax <br /> funding and $90,000 in reimbursement grant funding from PG&E. <br /> Page 3 of 4 <br />