My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
061620
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 10:46:11 AM
Creation date
6/11/2020 10:46:04 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2020
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUNOL BOULEVARD/I-680 IMPROVEMENTS <br /> PA&FD <br /> • Right-of-Way delineation will be based on as-built information. No field verification <br /> is proposed at this stage of design. <br /> • Right of way hard copy and appraisal maps; temporary construction easements; and <br /> legal descriptions are not included in the scope of services. <br /> • Title reports will not be included. <br /> Units <br /> • All project deliverables will be prepared in English units. <br /> Drainage/Hydrology <br /> • CONSULTANT will not perform scour analysis for any watercourses in the project <br /> area. <br /> • Detailed floodplain analysis other than the specified in the scope of work, is not <br /> included <br /> Utilities <br /> • Utility relocations are for study alternatives only <br /> • Utility agreements will not be prepared <br /> • Fees may be required by Utility Companies and are not included. <br /> Geotechnical <br /> • No subsurface exploration or laboratory testing will be performed. <br /> LCCA <br /> • Preliminary structural section alternatives for new ramp pavement will be based on an <br /> assumed subgrade R-value. Pavement rehabilitation study is excluded. <br /> Landscaping <br /> • Study of one landscape concepts are included <br /> • Irrigation design/planning are not included. <br /> Reviews and submittals <br /> • CONSULTANT will submit technical reports once in draft and once in final form, the <br /> intent being one review and one revision per document,unless otherwise specified. <br /> Project Management <br /> • Project management activities are provided for a 16-month period starting from Notice <br /> to Proceed. <br /> • Meeting Minutes includes up to one round of edits. <br /> Encroachment Permit and Permit Fees <br /> • Encroachment Permit and Permit Fees are not included in this scope. <br /> Materials and information provided by others <br /> • Relevant data from previous/ongoing studies in the project area <br /> • Utility record drawings <br /> April 10,2020 31 <br />