My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
061620
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 10:46:11 AM
Creation date
6/11/2020 10:46:04 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2020
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUNOL BOULEVARD/I-680 IMPROVEMENTS <br /> PA&FD <br /> 6. Accelerated Bridge Construction (ABC) Questionnaire <br /> 7. Risk Assessment Form <br /> An APS Construction Cost Estimate will be developed by estimating quantities for major <br /> items of work and assigning prices to each item. A contingency factor of 25% and <br /> mobilization factor of 10%of the total of the items cost will be added to the estimate. <br /> This proposal assumes one(1) draft submittal for review and comment,and one(1) final <br /> submittal. <br /> The final submittal will include one(1)hard copy of the plans and estimate and a CD <br /> containing the electronic files of the Microstation drawings and estimate. <br /> Subtask 5.8-Preliminary Geotechnical Report. <br /> Site visits will be performed and available data will be reviewed, including geotechnical <br /> data developed for the Project. Possible geotechnical/geologic impacts and mitigation <br /> measures will be discussed on a broad basis including but not limited to slope stability, <br /> geology, seismic impacts and risk,erosion, groundwater conditions, etc. for proposed <br /> bridge widenings,retaining walls, cuts and embankments. Generally, the geotechnical <br /> issues relevant to the project will be presented in a qualitative manner with no specific <br /> design recommendations. Potential mitigation measures will also be provided in a <br /> discussion format. All of this will be incorporated into a Preliminary Geotechnical <br /> Report. <br /> Structure Preliminary Geotechnical Reports(SPGR)will be prepared for the bridge widen <br /> and retaining walls in accordance with Caltrans standards, to support the APS submittals. <br /> It is expected that up to four SPGRs will be required: one for the on-ramp bridge, one for <br /> retaining walls at the existing railroad bridge, one for retaining walls at the Pleasanton- <br /> Sunol UC, and one for retaining walls along Sunol Boulevard. Fieldwork will be limited <br /> to a site visit by the Geotechnical Engineer and a site visit by the Certified Engineering <br /> Geologist. The SPGRs will provide an overview of the existing foundations, site geology, <br /> seismicity,and,if possible,recommendations regarding suitable and unsuitable foundation <br /> types. If appropriate, the SPGR will also discuss the anticipated field and laboratory work <br /> required to support the future Preliminary Foundation Reports and the future Foundation <br /> Reports. <br /> Other efforts include providing a preliminary pavement recommendations memorandum <br /> based on an assumed subgrade R-value and design traffic index provided by others to <br /> support the Life-Cycle Cost Analysis(LCCA),and other input on the alternatives regarding <br /> excavations, fill slopes, retaining walls, and possible mitigation measures for settlement <br /> and liquefaction issues that can be expected. <br /> Subtask 5.9—Construction Cost Estimate and Schedule. CONSULTANT will prepare <br /> a Project Report Level Cost Estimate and Schedule, in accordance with Caltrans <br /> requirements. Major construction items, quantities,unit prices, and soft costs will be <br /> identified to estimate total project costs including allowances for mobilization and <br /> contingencies (appropriate for this level of design detail). Cost variants for alternatives <br /> will be estimated, if necessary. Right-of-way and utility relocation costs will be <br /> approximated at this stage of design using available information. <br /> April 10,2020 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.