My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
061620
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 10:46:11 AM
Creation date
6/11/2020 10:46:04 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2020
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUNOL BOULEVARD/I-680 IMPROVEMENTS <br /> PA&ED <br /> information will also be summarized in the R/W Data Sheet (Caltrans Exhibit 4-ex-4) as <br /> stated in Task 9.1 <br /> Subtask 5.2 Utility Coordination. <br /> CONSULTANT will develop accurate existing utility mapping for the project area, <br /> locating utilities that potentially conflict with the proposed improvements, and <br /> developing relocation plans for conflicting utilities will be a critical task during project <br /> development. CONSULTANT will: <br /> • Review and update as-built utility information <br /> • Prepare existing utility maps <br /> • Submit utility maps to affected utility owners <br /> • Field verify utility locations with utility owners <br /> • Identify potential utility conflicts, and <br /> • Prepare Utility relocation Memorandum <br /> • Maintain a Utility Relocation Log <br /> • Prepare Utility Information Sheet(Caltrans Exhibit 4-ex-5) <br /> • Assure that necessary utility impacts caused by the proposed construction have been <br /> addressed. <br /> • Prepare input on utility agreements. <br /> • Develop utility plans(U-drawings)that indicate utilities to be relocated and utility <br /> envelope plans. <br /> CONSULTANT will identify and propose final locations of all utilities that are affected by <br /> the Project, such as water, sewer, gas,electric, cable TV, and telephone. <br /> Subtask 5.3—Preliminary Stage Construction/Traffic Handling& IMP. <br /> A conceptual stage construction/traffic handling plan will be developed by <br /> CONSULTANT for each of the two preferred alternatives to verify that the project is <br /> constructible,and that traffic impacts are minimized and public safety is not compromised. <br /> Roadway improvements will be coordinated with existing facilities to assess whether <br /> detours are needed to construct them. To ensure that traffic operations are not impacted, <br /> detour plans will seek to preserve the same lane capacity as the existing roadway system. <br /> CONSULTANT will prepare a draft Traffic Management Plan(TMP) in accordance with <br /> Caltrans requirements. CONSULTANT will work with traffic engineering/operations <br /> personnel and other relevant technical specialists(such as right-of-way experts,pavement <br /> engineers, and environmental specialists)to obtain the necessary project information and <br /> help identify potential issues or concerns. This collaboration will help to develop the best <br /> combination of design, construction phasing/staging, and work zone management <br /> strategies. With proper planning,potential traffic problems will be eliminated by <br /> modifying the design or construction phasing. If traffic studies are needed to develop <br /> TMP strategies,these will be initiated as soon as possible to make sure that the needed <br /> data is available. As information becomes available,the preliminary scope and cost of the <br /> overall TMP and the individual elements will continue to be refined. CONSULTANT <br /> will coordinate the TMP strategies with Caltrans appropriate functional units,with each <br /> team member handling their area of expertise. <br /> April 10,2020 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.