My WebLink
|
Help
|
About
|
Sign Out
PC-2003-42
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2003
>
PC-2003-42
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2007 9:35:13 AM
Creation date
3/24/2004 12:51:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/24/2003
DOCUMENT NO
PC-2003-42
DOCUMENT NAME
PUD-01-3M
NOTES
MARDELL LLC
NOTES 3
MAJOR MOD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
47. The homes covered by this approval shall be constructed to encourage telecommuting by <br />providing as an option telecommunications infrastructure consistent with state-of--the-art <br />methods, e.g., cabling for DSL service, wiring for total room access, etc. The project de- <br />veloper shall submit with the first building permit application those measures included in <br />the home construction for review and approval by the Planning Director before issuance <br />of the first building permit. <br />48. The project developer shall ensure that there is full articulation, e.g., shutters, trim, grids, <br />and similaz design details, on the homes facing the public trail located on the Old Vine- <br />yazd Avenue right-of--way so that the designs of the sides of the homes facing the trail <br />matched the designs of the homes' front elevations. These details shall be shown on the <br />building permit plan set to the satisfaction of the Planning Director before issuance of a <br />building permit. <br />Photovoltaic Systems: <br />49. The project developer shall provide to the buyers of the houses covered by this approval, <br />photovoltaic systems as an option. With the building permit plan set, the project devel- <br />oper shall show the installations for each of the buildings covered by this approval to the <br />satisfaction of the Planning Developer before issuance of a building permit. <br />50. The project developer shall implement the following measures with the construction of <br />the structures covered by this approval so that the owners can install roof-mounted photo- <br />voltaic systems in the future: <br />a. Electrical conduit and cable shall be installed from the roof/attic areas to the build- <br />ings' main electrical panels. <br />b. Roof trusses shall be "engineered" to handle an additional load of five pounds per <br />squaze foot beyond that of the anticipated for roofing. <br />c. An area shall be provided neaz the electrical panel for the "inverter" required to <br />convert the direct current output from the photo-voltaic panels to alternating cur- <br />rent. <br />d. A bi-directional electrical meter shall be installed. <br />These measures shall be shown on the building permit plan set submitted to the Planning <br />Director for review and approval before issuance of the first building permit. The project <br />developer shall provide to the future homebuyers the necessary information delineating <br />the means by which photovoltaic panels can be applied to the roofs of the structures cov- <br />ered by this approval. This information shall be submitted to the Director of Planning for <br />review and approval prior to occupancy of the first unit. <br />PUD-Ol-3M, PC Conditions Page 13 of 26 September 24, 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.