Laserfiche WebLink
have a higher trip generation rate compared to restaurants without drive-throughs'. <br /> Thus, fuel consumption from those trips and/or from idling vehicles waiting in the drive- <br /> through queue would also increase. <br /> A traditional restaurant would also potentially be more consistent with General Plan and <br /> CAP goals to encourage pedestrian-oriented development. For example, it could <br /> improve pedestrian-friendliness, by allowing additional space to be dedicated to <br /> pedestrian circulation and seating areas, and for more generous landscaping <br /> throughout "Pad B," along Rosewood Drive and along the adjacent driveway located <br /> immediately to the south side of "Pad B." Although alternative site plans without a drive- <br /> through have not been developed by the applicant, eliminating the need for a drive- <br /> through aisle may also open up other possible site plan configurations, such as a design <br /> that would orient the building closer to Rosewood Drive and the corner, versus being <br /> placed toward the center of"Pad B," presenting a more positive streetscape look and <br /> feel. <br /> Potential Development Review Process <br /> The PMC requires Planning Commission review and approval of a CUP in all <br /> commercial districts for restaurants with a drive-through component. The CUP process <br /> allows the City to evaluate and place conditions to mitigate project impacts in areas <br /> such as land use consistency, traffic and circulation (including drive-through queuing), <br /> parking and noise. <br /> The PMC also requires all new improvements and structures in a PUD be subject to <br /> review and approval of a DR application. The PMC further states the Zoning <br /> Administrator (ZA) shall have authority over design issues where PUD conditions of <br /> approval specifically delegate decision making to the preexisting design review board. <br /> The ZA has the discretion to refer any DR application to the Planning Commission <br /> and/or the Planning Commission may appeal and call up any application acted upon by <br /> the ZA. <br /> Accordingly, should the City Council elect to support the proposed restaurant with a <br /> drive-through component, staff recommends the applicant be required to submit <br /> subsequent CUP and DR applications to adequately identify and address any project <br /> impacts and remaining design issues. <br /> Site Layout, Circulation, Parking, and Access <br /> The proposed restaurant footprint is similar to the existing footprint of the oil change <br /> facility except the proposed restaurant has been shifted further to the interior of the <br /> shopping center and away from Rosewood Drive. The circulation pattern, parking <br /> access and orientation is generally similar except the drive aisle and parking spaces at <br /> the north end of"Pad B" would be eliminated and/or modified to accommodate the <br /> drive-through queuing lane entrance and additional landscaping along the Rosewood <br /> 40.19 trips/1,000 sq. ft. of area in the a.m. peak and 32.67 trips/1,000 sq. ft. of area in the p.m. peak <br /> versus 25.10 trips/1,000 sq. ft. of area in the a.m. peak and 28.34 trips/1,000 sq. ft. of area in the p.m. <br /> peak <br /> Page 10 of 13 <br />