Laserfiche WebLink
Resolution No. PC-2003-29 <br />Page 7 <br />process prior to approval of the final parcel map. <br />9. The new lots shall be included in the existing GHAD for the Oak Tree Farm <br />subdivision. Prior to the approval of the final parcel map, the developer shall be <br />responsible for paying all costs associated with their inclusion in the GHAD, <br />including determination of pro rata share of on-going and special assessments, plan of <br />control modifications, and work completed as part of the PUD development plan <br />review, prior to approval of the minor subdivision. The inclusion of the lots and all <br />related studies, as determined by the City Engineer and City Attorney, shall be <br />completed prior to approval of the minor subdivision. <br />10. No habitable structures are permitted in the landslide setback areas. A separately <br />recorded restrictive covenant, subject to review and approval by the City Attorney, <br />shall be recorded addressing this prohibition of habitable structures in the landslide <br />setback areas of each of the lots. All improvements, landscaping, accessory <br />structures, etc., in this landslide setback area shall be subject to the review and <br />approval of the Planning Director and City Engineer prior to installation by the <br />homeowner. The individual lot owners shall be responsible for the costs of review by <br />the GRAD engineer of any reaz yard amenities, landscaping, accessory structures, etc. <br />proposed for construction within the landslide setback area on any of the three lots. <br />Upon receipt of any plans for this area, the Planning Director shall forward the <br />proposed plans to the GHAD Engineer for review and recommendation prior to <br />approval of the such plans. All damage to improvements constructed within this <br />landslide setback area shall be exempt from reimbursement from the GHAD and a <br />separately recorded covenant shall be recorded on the three lots to disclose this to <br />future lot owners. <br />11. The house foundations for the new residences on these lots shall be designed to <br />withstand the potential deformation from the ancient landslide as identified in the <br />project geotechnical reports. A copy of the structural foundation plans shall be <br />provided to the GHAD Engineer for review and approval during the building permit <br />plancheck process. All costs associated with the review of these plans by the GHAD <br />Engineer shall be the responsibility of the homeowner. <br />12. The perimeter of all building foundations shall be designed with subdrains which <br />shall be connected to an approved stonnwater collection facility subject to the review <br />and approval by the City Engineer. <br />13. The existing residential structure on proposed Parcel 3 may continue to be used as a <br />sales office for the subdivision until such time as Parcels 1 and 2 aze sold if an <br />adequate debris wall is constructed at the northwest corner of the structure. The <br />developer shall be responsible for providing a design of the debris wall for the review <br />and approval of the City Engineer, prior to approval of a minor subdivision. The <br />developer shall be responsible for paying all costs associated with the review of this <br />wall by the City's peer reviewing geotechnical engineer. The wall shall be <br />constructed prior to approval of the final parcel map. After the close of escrow on <br />