My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
030320
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2020 9:40:43 AM
Creation date
2/27/2020 9:40:42 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/3/2020
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. LAVTA requested the installation of a bus shelter pad to reinstall a bus shelter <br /> near the intersection of Springdale Avenue and Stoneridge Drive to service the <br /> Kaiser medical facility. LAVTA provided $5,000 to fully cover the cost of this <br /> request. <br /> 3. The Operation Services' Parks Division identified the need to remove the <br /> plantings and install cobblestone in the center median of Bernal Avenue, west of <br /> 1-680, to avoid continued sprinkler and plant damage caused by vehicles <br /> swinging wide and onto the median when turning left onto eastbound Bernal <br /> Avenue from the southbound 1-680 exit ramp. The contractor's pricing was more <br /> cost-effective than utilizing the City's on-call contactors. <br /> 4. In order to repair the damage from PG&E's gas line replacement work that <br /> occurred over the summer on Saint Marys Street and Division Street, it was <br /> determined that a change order should be issued to the Annual Resurfacing CIP <br /> No. 18503 to resurface the streets from curb to curb. (PG&E participated in the <br /> cost of the paving change order instead of simply patching their trench line, but <br /> that is the subject of the street resurfacing contract). In accordance with the law, <br /> the repaving work triggered the need to remove and replace four pedestrian <br /> ramps that were significantly out of compliance with current ADA standards. <br /> These four ramps caused the change order total to exceed the contract <br /> contingency amount approved by City Council. Quotes were obtained from the <br /> City's on-call contractors, and Rosas Brothers Construction, in the attempt to <br /> avoid exceeding the contingency. Rosas Brothers Construction provided the best <br /> pricing and was able to meet the project schedule. Approval of the transfer funds <br /> as outlined in the recommendation and restated below, in effect, retroactively <br /> approves the expense beyond the authorized contingency. <br /> Funding for this project totaled $496,311 as outlined in Attachment 1. Expenditures <br /> totaled $511,207, leaving a project shortfall of$14,896. Staff recommends an allocation <br /> of$5,000 from the LAVTA reimbursement to CIP No.18509, and the transfer of$9,981 <br /> of funds from CIP No. 18505 to CIP No. 18509 to cover the project shortfall. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.