Laserfiche WebLink
Resolution No. PC-2003-19 <br />Page 4 <br />8. If required by the Chief Building and Safety Official, the applicant shall submit a site <br />soils report with the building plan check materials. The soils report will not be required if <br />the basement is deleted. The soils report shall evaluate the presence of groundwater <br />and/or springs on the site and shall recommend measures to prevent any seepage created <br />by the basement onto the adjoining property. If deemed necessary by the Chief Building <br />and Safety Official, a third party peer review of the soil report shall be completed. The <br />City will select all third party peer reviewers. All third party peer reviews shall be paid <br />for by the building developer at the time specified by the Chief Building and Safety <br />Official. <br />9. All site improvements and house construction activities shall be limited to the hours of <br />8:00 a.m. to 5:00 p.m., Monday through Friday. All construction equipment must meet <br />Department of Motor Vehicles (DMV) noise standards and shall be equipped with <br />muffling devices. <br />10. Final inspection by the Planning Department is required prior to occupancy. <br />11. The applicant shall work with the Planning Department staff to add design detailing to <br />the side building elevation of the addition for greater architectural variety and visual <br />interest. This change shall be shown on the building permit plan set to the satisfaction of <br />the Planning Director before issuance of the building permit. <br />< End > <br />