Table 1 <br /> SUMMARY OF POTENTIALLY SIGNIFICANT TRANSPORTATION AND TRAFFIC IMPACTS <br /> Impact Location Affected Mitigation Physical Improvement or Other Mitigation Level of Impact <br /> Measure After Mitigation <br /> Impact 4.D-1: Commerce Drive at Johnson Drive Intersection.The addition <br /> Development of vehicle trips generated by Phase I of the EDZ during the PM Install traffic signal. <br /> peak hour would worsen the side street movement at this 4.D-1a Less than <br /> facilitated by the Significant <br /> proposed EDZ would intersection to LOS F;this condition would be further worsened Construct southbound leftturn lane to Commerce Drive. <br /> affect levels of with full EDZ buildout conditions.(Impact 4.D-1a) <br /> service at the local Johnson Drive at Owens Drive(North)Intersection.The <br /> study intersections addition of vehicle trips generated by Phase I of the EDZ during <br /> under Existing plus the Saturday peak hour would degrade the service level at this Less than <br /> Project conditions. intersection from LOS C to LOS E. Conditions would be slightly 4.D-1 b Install traffic signal. <br /> exacerbated with full EDZ buildout conditions(i.e.,conditions Significant <br /> would worsen but LOS would not be degraded from E to F). <br /> (Impact 4.D-1b) <br /> Johnson Drive at Stoneridge Drive Intersection.The 1. Third eastbound left-turn lane to Johnson Drive plus <br /> addition of vehicle trips generated by full buildout of the EDZ additional northbound receiving lane on Johnson Drive. <br /> during the PM peak hour would worsen conditions at this 4.D-1 c 2. Additional southbound right-turn lane on Johnson Drive. Less than <br /> intersection from LOS D to LOS E.This impact would not occur Significant <br /> under conditions caused by Phase I of the EDZ. (Impact 4.D- 3. Rebuild(widen)Johnson Drive to six lanes(3 southbound <br /> 1c) lanes,3 northbound lanes)for a minimum of 700 feet. <br /> Stoneridge Drive(Queue Spillback).The addition of vehicle M-TR-1 Implement Transportation Demand Management(TDM) Significant and <br /> trips generated by Phase I and full buildout of the EDZ would Program Unavoidable due to <br /> result in vehicle queue spillback from Stoneridge Drive onto 1. Stoneridge Drive at northbound 1-680 off-ramp: Provide uncertainty about <br /> adjacent intersections and the freeway mainline. (Impact 4.D- northbound right-turn overlap phase. ultimate Caltrans <br /> 1d): 2. Second southbound left-turn lane from Johnson Drive to approval for 1-680 <br /> 1. Vehicle queue spillback from the 1-680 northbound off- Stoneridge Drive. improvement(#4)& <br /> ramp and southbound off-ramp onto the freeway the need for all <br /> 3. Extend westbound right-turn pocket onto Johnson Drive improvements to be <br /> mainline. approximately 800 feet east(widen Stoneridge Drive,convert completed in order <br /> 2. Vehicle queue spillback impeding through traffic on 4.D-1d resulting lane into through-right-shared lane). to fully mitigate the <br /> Stoneridge Drive and blocking access to driveways acts. <br /> along Johnson Drive. 4. Second on-ramp lane to northbound 1-680 from westbound impacts. <br /> Stoneridge Drive approach(lanes will merge;lane drop Funding:City's TIF, <br /> would occur over a distance of at least 800 feet;bridge except M-TR-1— <br /> reconstruction and widening). funding from site <br /> developer(s) <br />