My WebLink
|
Help
|
About
|
Sign Out
PC-2003-10
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2003
>
PC-2003-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2007 9:30:23 AM
Creation date
3/23/2004 12:43:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/12/2003
DOCUMENT NO
PC-2003-10
DOCUMENT NAME
PUD-02-1D
NOTES
CITY OF PLEASANTON
NOTES 3
FIRE STATION
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
be shown on the building permit plan set to the satisfaction of the Planning director be- <br />fore the issuance of a permit for grading, foundation, or the building shell. <br />73. The fuel dispensing area shall be dry-swept routinely, and dispensing equipment shall be <br />inspected routinely for proper functioning and leak prevention. The facility shall have a <br />spill clean-up plan approved by the Fire Deparhnent, which shall be posted within the fire <br />station's living quarters and equipment bay. <br />74. Prior to the commencement of any clearing, grading, or excavation, the project developer <br />shall submit a copy of the State Water Resources Control Board Notice of Intent (NOI) <br />for coverage under the State Construction Storm Water General Permit. <br />75. The project developer shall include erosion controUstorm water quality measures on the <br />final grading plan which shall specifically address measures to prevent soil, dirt, and de- <br />bris from entering the storm drain system. Such measures may include, but are not lim- <br />ited to, hydroseeding, hay bales, sandbags, and siltation fences and are subject to the re- <br />view and approval of the City Engineer/Chief of Building and Safety. If no grading plan <br />is required, necessary erosion control/storm water quality measures shall be shown on the <br />site plan submitted for an on-site permit, subject to the review and approval of the Chief <br />of Building and Safety. The project developer is responsible for ensuring that the con- <br />tractor is aware of and implements such measures. <br />76. The site shall be revegetated and stabilized after completion of grading, but in no case <br />later than October 15. Hydroseeding shall be accomplished before September 15 and ir- <br />rigated with a temporary irrigation system to ensure that the grasses are established be- <br />fore October 15. No grading shall occur between October 15 and April 15 unless ap- <br />proved erosion control/storm water quality measures are in place, subject to the approval <br />of the City Engineer/Director of Building Inspection. Such measures shall be maintained <br />until such time as permanent landscaping is place. <br />77. All metal roofs used on the structures covered by this approval shall be finished with <br />rust-inhibitive paint. This detail shall be shown on the building permit plan set to the sat- <br />isfaction of the Planning Director before issuance of a building permit. <br />78. The project developer shall submit a construction Best Management Practices (BMP's) <br />program for review and approval by the Planning Director prior to issuance of building <br />and/or grading permits. These BMP's shall be implemented by the general contractor and <br />all subcontractors and suppliers of materials and equipment. Construction site cleanup <br />and control of construction debris shall also be addressed. Failure to comply with the ap- <br />proved construction BMP may result in the issuance of correction notices, citations, or a <br />stop work order. <br />wu-v~-tt{ (,'onditions ojApproval <br />per Planning Commission March 12, 2003 <br />Page 11 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.