My WebLink
|
Help
|
About
|
Sign Out
PC-2003-10
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2003
>
PC-2003-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2007 9:30:23 AM
Creation date
3/23/2004 12:43:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/12/2003
DOCUMENT NO
PC-2003-10
DOCUMENT NAME
PUD-02-1D
NOTES
CITY OF PLEASANTON
NOTES 3
FIRE STATION
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
62. The project developer shall submit a dust control plan or procedure as part of the im- <br />provement plans. <br />63. Storm drainage swales, gutters, inlets, outfalls, and channels not within the area of a <br />dedicated public street or public service easement approved by the City Engineer shall be <br />maintained by the property owner. <br />64. Approval of the storm drainage system for the overall fire station development including <br />vegetative filter swales shall be subject to the review and approval of the City Engineer <br />before issuance of a building permit. <br />65. Electric power distribution, gas distribution, communication service, cable television, and <br />any required alarm systems serving the fire station shall be installed underground in con- <br />duit. These details shall be shown on the building permit plan set to the satisfaction of <br />the Planning director prior to issuance of a building permit. <br />66. Any damage to existing street improvements during construction on the subject property <br />shall be repaired to the satisfaction of the City Engineer at full expense to the project de- <br />veloper. This shall include slurry seal, overlay, or street reconstruction if deemed war- <br />ranted by the City Engineer. <br />67. The project developer's contractor(s) shall obtain an encroachment permit from the City <br />Engineer prior to moving any construction equipment onto the site. <br />Urban Stormwater Runoff Requirements: <br />68. The project developer shall modify the site to provide vegetative filter/bio-Swale areas <br />with the following: <br />a. The vegetative filter/bio-Swale shown on the site plan shall be connected to the <br />existing Swale area paralleling the north side of Whispering Oaks Way at a loca- <br />tion to be determined by the Planning Director and the City Engineer before sub- <br />mittal of the building permit plan set. The final location of the vegetative fil- <br />ter/bio-Swale shall be shown on the building permit plan set prior to issuance of a <br />building permit. <br />b. The parking/driveway areas shall be crowned in the middle so that storm water <br />drains towards the vegetative filter/bio-Swale areas shown on the preliminary site <br />and landscape plans. <br />c• The project developer is directed to the "Start at the Source" Design Guidance <br />Manual for Storm Water Protection", 1999 Edition, produced by B.A.S.M.A.A., <br />for the type of turf material to be planted, the slope of the turfed area, and the need <br />per Planning Commission March 12, 2003 <br />Page 9 oj12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.