Laserfiche WebLink
<br />Resolution No. PC-99-93 <br />Page 11 <br /> <br />48. The paved area connecting the two parking lots shall be designated as a fire apparatus <br />access road. Details of the subject paved area shall be subject to review and approval by <br />the Fire Marshall to ensure that the pavers can support the weight of a City fire truck. <br /> <br />Police <br /> <br />49. If required by the Police Department, the building(s) shall be equipped with an alarm <br />system, the type to be approved by the Police Department and that this system shall be <br />installed prior to occupancy of the building. <br /> <br />Engineering <br /> <br />50 The applicant shall submit a final grading and drainage plan prepared by a licensed civil <br />engineer depicting all final grades and on-site drainage control measures, including <br />concrete-lined V -ditches, to protect all cut and fill slopes from surface water overflow. <br />This plan shall be subject to the review and approval of the City Engineer and/or the <br />Director of Building Inspection prior to the issuance of any building permits. <br /> <br />5 I Any existing wells on the site shall be removed or sealed, filled and abandoned pursuant <br />to Alameda County Ord. 73-68, prior to the start of grading operations unless Zone 7 <br />retains specific wells for observation wells, or special approval is obtained from the City <br />Engineer for temporary use of an existing well for construction water. Any wells <br />designated for abandonment or any wells, encountered during construction, are to be <br />destroyed in accordance with a permit obtained from Zone 7. <br /> <br />52 All existing septic tanks or holding tanks shall be removed or sealed, filled, and <br />abandoned, pursuant to the requirements of the Alameda County Department of Health <br />Services. <br /> <br />53 The haul route for all materials to and from this development shall be approved by the <br />City Engineer prior to the issuance of an encroachment permit. <br /> <br />54 The applicant shall include erosion control measures on the final grading plan, subject to <br />the approval of the City Engineer. The applicant is responsible for ensuring that the <br />contractor is aware of such measures. All cut and fill slopes shall be revegetated and <br />stabilized as soon as possible after completion of grading, in no case later than October <br />IS. No grading shall occur between October IS and April IS unless approved erosion <br />control measures are in place, subject to the approval of the Building Department. Such <br />measures shall be maintained until such time as permanent landscaping is in place. <br />