My WebLink
|
Help
|
About
|
Sign Out
2_Exhibits A & C
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2020
>
01-15
>
2_Exhibits A & C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2020 12:11:55 PM
Creation date
1/8/2020 12:11:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/15/2020
Document Relationships
2
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2020\01-15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Utilities <br /> 42. JOINT UTILITY TRENCH: All dry utilities (electric power distribution, gas distribution, <br /> communication service, cable television, street lights and alarm systems) required to serve an <br /> existing or new development shall be installed in underground conduit in a joint utility trench <br /> subject to the review and approval of the Director of Engineering/City Engineer and prior to City <br /> council acceptance of public improvements. <br /> Stormwater and Provision C.3 of the National Pollutant Discharge Elimination System Permit <br /> 43. STORMWATER TREATMENT: The project creates and/or replaces 10,000 square feet or more <br /> of impervious surface (collectively over the entire project site) and shall comply with Section <br /> "C.3.b Regulated Projects" of the NPDES Permit No. CAS612008, and amendments, issued by <br /> the San Francisco Bay Regional Water Quality Control Board. The improvements plans shall <br /> include the Stormwater Management Plan prepared by a California licensed civil engineer, <br /> indicating the type and locations of stormwater treatment measures to be installed (numbered <br /> sequentially for identification purposes), and sizing calculations. The Stormwater Management <br /> Plan shall be subject to review and acceptance by the Director of Engineering/City Engineer, prior <br /> to the issuance of an engineering or building permit, whichever occurs first. <br /> 44. STORMWATER TREATMENT MEASURES INSPECTION AND MAINTENANCE AGREEMENT: <br /> The applicant shall enter into a "Stormwater Treatment Measures Inspection and Maintenance <br /> Agreement" for annual maintenance and reporting of the stormwater treatment system as <br /> depicted on the improvement plans City-approved by the Director of Engineering/City Engineer. <br /> The agreement shall be filed for record at the Alameda County Clerk-Recorder's Office at a time <br /> determined by the Director of Engineering/City Engineer. <br /> 45. STATE OF CALIFORNIA CONSTRUCTION GENERAL PERMIT: A "Notice of Intent" (NOI) and <br /> "Stormwater Pollution Prevention Plan" (SWPPP) shall be prepared for construction projects <br /> disturbing 1 acre or more of land (including smaller sites that are part of a larger common plan of <br /> development). The applicant shall include the Waste Discharger Identification Number (WDID) on <br /> the title sheet of the improvement plans and provide proof of coverage under the State of <br /> California Construction General Permit to the Engineering Department prior to the approval of the <br /> improvement plans by the Director of Engineering/City Engineer. <br /> 46. STORMWATER POLLUTION PREVENTION PLAN: The applicant shall submit one hard copy <br /> and one PDF copy of the Stormwater Pollution Prevention Plan (SWPPP) for review and <br /> acceptance by the Director of Engineering/City Engineer prior to issuance of a building or <br /> engineering permit, whichever occurs first. A hard copy of the City-accepted SWPPP shall be <br /> available at the project site until all work is complete and engineering and building permits have <br /> been finaled. A site specific SWPPP shall be combined with proper and timely installation of the <br /> Best Management Practices, thorough and frequent inspections, maintenance, and <br /> documentation. Failure to comply with the reviewed construction SWPPP may result in issuance <br /> of correction notices, citations, or a stop work order. <br /> FIRE DEPARTMENT — 925-454-2361 <br /> The Fire Prevention Bureau reviews building/civil drawings for conceptual on-site fire mains and fire <br /> hydrant locations only. Plan check comments and approval DO NOT include: 1.) Installation of the on- <br /> site fire mains and fire hydrants. Specific installation drawings submitted by the licensed underground fire <br /> protection contractor shall be submitted to the Fire Prevention Bureau for approval; and 2.) Backflow <br /> prevention or connections to the public water mains. <br /> P19-0390 Planning Commission <br /> Page 7 of 11 <br /> will retain the cash <br /> deposit until all work is substantially complete, all areas are stabilized, and all hazards are <br /> mitigated to the satisfaction of the Director of Engineering/City Engineer. <br /> P19-0390 Planning Commission <br /> Page 6 of 11 <br />