My WebLink
|
Help
|
About
|
Sign Out
PC-99-71
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1999
>
PC-99-71
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:56 AM
Creation date
3/23/2004 8:56:52 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/13/1999
DOCUMENT NO
PC-99-71
DOCUMENT NAME
Z-99-228
NOTES
AUF DER MAUR, RICKENBACH
NOTES 3
COMMERCIAL BLDG
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />the general contractor and all subcontractors and suppliers of materials and equip- <br />ment. Construction site cleanup and control of construction debris shall also be <br />addressed. Failure to comply with the approved construction BMP may result in <br />the issuance of correction notices, citations, or a stop work order. <br /> <br />70. The project developer is responsible for implementing the following measures dur- <br />ing all construction phases ofthe project: <br /> <br />a. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed an a weekly basis. When ap- <br />propriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to storm water runoff pollution. <br /> <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />routes onto the site and place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. Broom sweep the <br />street pavement adjoining the project site on a daily basis. Scrape caked-on <br />mud and dirt from these areas before sweeping. <br /> <br />c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any de- <br />bris or dirt flowing in the storm drain system. Maintain and/or replace filter <br />materials to ensure effectiveness and to prevent street flooding. <br /> <br />d. Create a contained and covered area on the site for the storage of bags, ce- <br />ment, paints, oils, fertilizers, pesticides, or other materials used on the site <br />that have the potential of being discharged into the storm drain system <br />through being windblown or in the event of a material spill. <br /> <br />e. Never clean machinery, equipment, tools, brushes, or rinse containers into a <br />street, gutter, or storm drain. <br /> <br />f. Ensure that concrete/gunite supply trucks or concrete/plaster operations do <br />not discharge wash water into street, gutters, or storm drains. <br /> <br /><END> <br /> <br />October 14. 1999 <br />Page II of II <br /> <br />Final Conditions of Approval per Planning Commission <br />2-99-228, Commercial Service Building <br />
The URL can be used to link to this page
Your browser does not support the video tag.