My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
121719
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 2:04:48 PM
Creation date
12/11/2019 2:04:45 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/17/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton Fire Station 2 Privacy Upgrade Proposal <br /> September 25, 2019 <br /> Page 2 <br /> • Analyze the existing mechanical, plumbing and electrical systems to <br /> determine potential impacts based on proposed improvements. <br /> • Develop cost estimates for the station proposed improvements. The <br /> estimates prepared at this phase will be generally square foot cost <br /> estimates for the various building components, and will include a design <br /> development contingency (to allow for potential increases as the design is <br /> refined further in the later stages of the project). <br /> Meet with Project Team to discuss budget, program and design issues. <br /> - Prepare a design narrative describing the feasibility of the design <br /> approach for each station. <br /> - Make required submissions to City for preliminary report review and <br /> comments. <br /> Make corrections and adjustments to incorporate City comments and <br /> make final presentation to City Council to present report findings. <br /> For this Phase we have included three coordination meetings at a desired <br /> location with selected City staff and stakeholders. <br /> At the conclusion of this Phase a proposal will be provided for the <br /> additional services required to provide complete construction documents <br /> for the approved improvements. <br /> ADDITIONAL SERVICES TO BE PROVIDED ON AN HOURLY BASIS <br /> The following items are not included in the Basic Services, and will be provided <br /> as additional services only after written authorization is received. Unless a <br /> subsequent fixed fee proposal is provided, the work will be done on an hourly <br /> basis per the attached Hourly Rate Schedule. <br /> Additional Services not included in our basic scope of work include: <br /> Schematic Design, Design Development, Construction Documents, <br /> Bidding and Construction Administration services <br /> Geotechnical Engineering Services <br /> 280 Bettencourt Street Sonoma, CA 95476 <br /> www.jeffkatzarchitecture.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.