Laserfiche WebLink
Pleasanton Library Construction Support Services <br /> November 19, 2019 <br /> Page 3 <br /> In addition to the items above, we will provide the requested design services to <br /> assist with a foundation and electrical work for the new storage container being <br /> provided by others. The scope of work includes providing structural engineering <br /> services for the foundation design and connection details for the storage unit to be <br /> provided exterior to the existing Library, as well as electrical design for power to <br /> serve the storage unit. <br /> The additional fee for the above noted items is a fixed fee of Forty Two Thousand <br /> Dollars ($42,000.00). Invoices will be submitted monthly for the percentage of <br /> work completed during the month. The breakdown will be as follows: <br /> Storage Unit Foundation and Electrical Scope $ 5,000.00 <br /> Additional Construction Administration Phase $ 35,000.00 <br /> Reimbursable Expenses (Not to Exceed) $ 2,000.00 <br /> TOTAL $ 42,000.00 <br /> I appreciate the opportunity to present this proposal. If this is acceptable please <br /> prepare a Change Order in this amount. If you have any questions regarding this <br /> scope of work please do not hesitate to contact me at (619) 698-9177. <br /> Respectfully, <br /> . <br /> Jeff Katz, AIA <br /> President <br /> 28o Bettencourt Street, Sonoma, CA 95476 <br /> www.jeffkatzarchitecture.com <br />