hazardous materials, hydrology and water quality, land use and planning, noise, population
<br /> and housing, public services and utilities systems, transportation and traffic, and recreation
<br /> would be mitigated (when appropriate) to less than significant levels. The mitigation measures
<br /> are generally typical of measures applied to development in Pleasanton, such as dust control
<br /> during construction; pre-construction surveys to avoid impacts on birds, bats or burrowing owls;
<br /> protection of waterways and riparian vegetation; archaeological monitoring for archaeologically
<br /> sensitive sites; Phase 1 environmental assessments required to assess and remediate any
<br /> hazardous materials on sites; a limitation on the hours of construction; and vibration and
<br /> acoustical studies to determine appropriate construction techniques and sound mitigation for
<br /> new buildings.
<br /> The DSEIR analyzed three alternatives (No Project, Reduced Retail, and Partial Buildout),
<br /> which can be found in Chapter 5 of the DSEIR. The DSEIR found that none of the alternatives
<br /> completely achieve the desired project objectives nor do any of these alternatives completely
<br /> reduce all significant but unavoidable impacts.
<br /> Figure 2: Required JDEDZ Transportation Mitigation Measures
<br /> It 5+�' (1 !" MITIGATION MEAS URE
<br /> 14 4D3 IMPROVEMENTS,
<br /> ! CONCEPTUAL LEVEL
<br /> �t- ! ��
<br /> •
<br /> I 6
<br /> /•
<br /> L
<br /> MITIGATION MEASURE / .,i
<br /> 4.p1A IM PROVEMIENTS, - ,\\\
<br /> �:, CCMICEPIVAL LEVEL s 11 \\
<br /> 17F
<br /> I �`
<br /> )1 0
<br /> ---- MITIGATION MEASURE
<br /> 6 18 18IMPROV'VW EMENTS
<br /> IIII
<br /> M" "'
<br /> .p NiKV1IION MtANURt4 I CONCEPTUAL LEVEL •
<br /> {-
<br /> IMIMO I C
<br /> 1... '
<br /> ,�. ..w , T 1 ^.
<br /> 1111
<br /> _ � l. 110
<br /> T.. _ .LI
<br /> �AYfIGAT10N ME/1NlIFf �-1�
<br /> ee
<br /> 7
<br /> I '
<br /> it
<br /> t - 4-6ICA1�66IO --111.10.11111 .0'
<br /> Mwww M.S. -'ham e
<br /> ➢o i caM4�MmEALLeva
<br /> P14-0852 and PUD-105, JDEDZ Planning Commission
<br /> 11 of 15
<br />ant
<br /> with mitigation.
<br /> The DSEIR also found four significant and unavoidable impacts related to transportation and
<br /> traffic. To summarize, the DSEIR found the JDEDZ will generate increased traffic, affecting the
<br /> levels of service for freeway ramps along 1-680 and surface streets in and around the project
<br /> area. It should be noted that proposed transportation mitigation improvements in the DSEIR
<br /> would result in acceptable levels of service (i.e., duration of delay in traveling through an
<br /> intersection), acceptable vehicle queue spillback (i.e., backed-up traffic potentially affecting
<br /> operation of an upstream intersection), and acceptable freeway ramp operations. However,
<br /> traffic impacts are characterized as significant and unavoidable because some of the needed
<br /> improvements require approval by Caltrans and thus are outside the immediate control of the
<br /> City. The graphics below (Figures 2 and 3) are intended to provide an overview of the required
<br /> transportation mitigation improvements resulting from the implementation of the JDEDZ. For
<br /> more detailed information, please refer to Chapter 4.D of the DSEIR (Exhibit D).
<br /> The DSEIR concluded that other impacts from the JDEDZ on aesthetics, air quality, biological
<br /> resources, cultural resources, geology and soils, greenhouse gas emissions, hazards and
<br /> P14-0852 and PUD-105, JDEDZ Planning Commission
<br /> 10 of 15
<br />process after receipt of a complete application.
<br /> P14-0852 and PUD-105, JDEDZ Planning Commission
<br /> 8 of 15
<br /> ,,,..., w
<br /> '-` V, ,
<br /> ' :# \ I. # ..„ ,
<br /> 3409 3436 , 3439 c,,,,,,, p 3 u,
<br /> , 17,, 406. '-• o- • 343 n5 '''
<br /> 3640 3636 -..,,,90
<br /> '' \ 4,\,i, ' 4
<br /> 0
<br /> -A
<br /> A '--, ' / ' `') } '\'if , w\tis,"/ V ,
<br /> itiib/ ifo,, /1*-4•1 4
<br /> A 3656 .1 ,,.;,' , 1 J - I
<br /> --
<br /> -
<br /> rI
<br /> ./7 '-' 17 Fairlands o
<br /> ".) .L. , IF0j23 /
<br /> V
<br /> mfl'f 'S
<br /> . l' 0' (-1/
<br /> 4VA'" c:T
<br /> i
<br /> , V 7
<br /> .... '',..,
<br /> 7
<br /> _ ..... „.
<br /> f I
<br /> M :I
<br /> 3289
<br /> 7, 60;
<br /> .s114 301
<br /> ,37
<br /> ... eich 31 AR 3195 al '
<br /> 1:3,800
<br /> 0 0.0475 0.095 mi P19-0283, 6700 Santa Rita Rd, Panache Academie Planning Division
<br /> November 18,2019 r,
<br /> 0 237.5 475 Feet