My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
2019
>
102819
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2019 11:26:53 AM
Creation date
10/23/2019 11:26:52 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FUNDING <br /> The approximate funding available is $250,000. While detailed estimates for each of the four <br /> projects has not been finalized, it is estimated that Project 1 — Valley Avenue at Hansen Drive is <br /> estimated between $50,000 and $100,000. Project 2, Iron Horse Trail Wayfinding, is estimated <br /> at $20,000. Project 3, Stoneridge Drive Buffered Bike Lanes, is estimated at $30,000 <br /> (approximately 13,000 feet at $2.25 per foot, not including green paint). Project 4, Bernal at <br /> Hearst and Bernal at Kottinger, is estimated between $50,000 and $200,000. <br /> These totals exceed the available $250,000 and the scope of work for Projects 3 and 4 will be <br /> adjusted based on finalized costs. Detailed designs will be shared with the BPTC for review and <br /> feedback prior to construction. <br /> Submitted by: <br /> Matt Nelson <br /> Associate Traffic Engineer <br /> Page 2 of 2 <br />