Laserfiche WebLink
T7 " <br /> `, 7147 `' A//f EXHIBIT C <br /> 2200 �, 41 <br /> At i' <br /> w <br /> 4. <br /> rrl <br /> rri <br /> , ,:‘,.' <br /> • <br /> 1,e <br /> -i K -1://.., <br /> . ,74-..-7 <br /> s ,,,,,s 11\01\ <br /> ,r-A- ,- ,„,-1.4 ,, , /4„,,,,,: ,,,., <br /> ,-0. , \ / / - i'...: . ' .. <br /> , a ..i.,, ._,,, - .., / <br /> / . <br /> i! <br /> ,6, IA,(k, ,v,,, i\.\\---: ,.„ <br /> o y. <br /> l4 / <br /> / If <br /> -1--- ii tfc:i..iii; .9 <br /> /' 0,� - �v S <br /> 7/ ./ t, tt,":,4 <br /> 4 9 ::,:-.7::: <br /> ss _...„ - 7' \ <br /> \t\ <br /> 9`7 <br /> 1PP* .0 , 4,, \> i :...,..7c.., .......,,...://r//.5 s si,. /. .. <br /> Ad6 <br /> \= ii-.4...? t 'T, 9t, <br /> pail 1416* Z7..,. ., \\\„ <br /> 0 ! ''' \ . , v <br /> 9 At <br /> 29 " ~ <br /> y n <br /> 1333 ..„ ry� <br /> //ff // Al <br /> ,n yry�rwrrpllY��. e � <br /> / <br /> \ / <br /> __.__ <br /> 4., <br /> I <br /> 1:4,800 <br /> o 005 0l1 m P19-0151 , 5 WINDING OAKS KEVIN GREGORY _ �'1 <br /> ' Planning Division _ <br /> October 4,2019 <br /> 0 300 600 Feet [�L�'�S:4NTON <br /> detrimental to <br /> the health of the tree. <br /> c. Nothing may be stored within the dripline of the tree canopies. This includes <br /> equipment, oil, gas, chemicals, harmful materials, fill or storage. <br /> d. No oil, gasoline, chemicals, or other harmful materials shall be deposited or disposed <br /> within the dripline of the trees or in drainage channels, swales, or areas that may lead <br /> to the dripline. <br /> e. No sign, wires, or ropes shall be attached to the trees. <br /> f. No stockpiling/storage of construction materials, fill, etc., shall take place underneath <br /> or within 5-feet of the dripline of the existing trees. <br /> g. No equipment or temporary structures shall be placed within or beneath the dripline of <br /> the existing trees. <br /> Failure to comply with these requirements may result in a "stop work order". <br /> 75. SITE LIGHTING: All site lighting shall be Dark Sky Compliant and shall be subject to review and <br /> approval by the City Landscape Architect prior to building permit issuance. <br /> END <br /> P19-0151 Planning Commission <br /> Page 12 of 12 <br /> up to 6-inches in diameter and farther than 8-feet from the tree trunk may be <br /> removed if they are in conflict with the proposed work. Roots that are removed shall <br /> be cleanly cut using a hand saw. <br /> P19-0151 Planning Commission <br /> Page 11 of 12 <br /> for the Project <br /> Arborist to conduct a field inspection prior to building permit issuance to ensure all <br /> recommendations have been properly implemented. The Project Arborist shall certify in writing all <br /> P19-0151 Planning Commission <br /> Page 10 of 12 <br />rotection contractor shall be submitted to the Fire Prevention Bureau for approval; and 2.) Backflow <br /> prevention or connections to the public water mains. <br /> P19-0151 Planning Commission <br /> Page 8 of 12 <br />City will retain the cash <br /> deposit until all work is substantially complete, all areas are stabilized, and all hazards are <br /> mitigated to the satisfaction of the Director of Engineering/City Engineer. <br /> P19-0151 Planning Commission <br /> Page 7 of 12 <br />