Laserfiche WebLink
• Applicant: City of Pleasanton <br />• Staff Contact(s): Mike Tassano <br />47. Owens at Iron Horse Trail Transportation/Traffic Project <br />Crossing Modification <br />Owens Drive Adaptive <br />Staff presented the results of the six-month study to City Council in January 2018 and <br />Council recommended that an adaptive signal timing system be purchased to address the <br />one-two minutes per day where congestion remains. A Capital Improvement Program <br />(CIP) to install adaptive signal system was added to the 2018/19 CIP. <br />• Status Under Review <br />• Next Steps/Details: The Adaptive Signal hardware has been purchased and <br />delivered and the system will be installed. <br />• Applicant: City of Pleasanton <br />• Staff Contact(s): Mike Tassano <br />48. Intersections of Transportation/Traffic Project <br />Stan leyNalleyBernal, <br />Santa RitaNalley, Santa <br />Rita/Stoneridge <br />World Smartest Intersection <br />Installation of next generation traffic signal equipment for signal performance, conflict <br />analysis, origin -destination studies, multi -modal traffic safety and connected vehicle <br />applciations. <br />• Status Under Construction <br />• Next Steps/Details: Receive equipment and Installation/programming. <br />• Applicant: City of Pleasanton <br />• Staff Contact(s): Mike Tassano <br />Traffic Calm in <br />49. West Las Positas Transportation/Traffic Project <br />West Las Positas Traffic Calming <br />Residents along West Las Positas (between Fairlands Elementary School and Staples <br />Ranch) have called for concerns about speeding. This section of West Las Positas was <br />evaluated as part of the Traffic Calming program and was the top ranked street eligible <br />for traffic calming. An inital public meeting was held on December 5, 2018 to describe <br />the program, the data collected and next steps should the neighborhood wishes to <br />continue forward with the program. <br />• Status Under Review <br />• Next Steps/Details: A second neighorhood steering committee was held in <br />March 2019 with the focus of focusing the scope of the <br />project area. The steering committee is finalizing design <br />and will begin the petition process. <br />• Applicant: City of Pleasanton <br />Page 16 of 20 <br />