Laserfiche WebLink
15. RECYCLED WATER: Water used by the drive-through carwash shall be recycled. (Project <br /> Specific Condition) <br /> 16. BUILDING MATERIALS AND COLORS: The building materials and colors in the Approved Plans <br /> shall be stated on the building permit plans. <br /> 17. ROOF MATERIAL: The roof for the proposed buildings and fuel station canopy shall be flat <br /> concrete tile. Prior to issuance of a building permit, a sample of the proposed roof material shall <br /> be submitted to the Planning Division, and it is subject to review and approval by the Director of <br /> Community Development. (Project Specific Condition) <br /> 18. SIGN PROGRAM: Site and building signage shall be reviewed under a comprehensive sign <br /> program submitted to the Planning Division under a separate application. <br /> 19. OUTDOOR STORAGE: There is to be no outdoor storage without prior approval by the City. <br /> 20. LIGHTING PLAN: The applicant shall submit a revised lighting plan with the building permit <br /> submittal. The luminosity of on-site lighting shall be reduced to minimize light spill beyond the <br /> project site onto to adjoining properties and/or streets. The plan shall include photometric <br /> contours, manufacturer's specifications on the fixtures, and mounting heights. All exterior lighting <br /> including landscape lighting shall be directed downward and designed or shielded so as to not <br /> shine onto neighboring properties or streets. The photometrics shall be reviewed and approved <br /> by the City Traffic Engineer and Director of Community Development prior to building permit <br /> issuance. The type and location of all exterior light fixtures shall be reviewed and approved by the <br /> Director of Community Development prior to building permit issuance. (Project Specific <br /> Condition) <br /> 21. BUILDING SURVEY: The applicant shall submit a building survey and/or record of survey and a <br /> site development plan in accordance with the provisions of Chapter 18.68 of the PMC. These <br /> plans shall be approved by the Chief Building Official prior to building permit issuance. The site <br /> development plan shall include all required information to design and construct site, grading, <br /> paving, drainage, and utilities. <br /> 22. PAD AND SETBACK CERTIFICATION: The applicant shall submit a pad elevation certification <br /> prepared by a California licensed land surveyor or registered civil engineer to the Chief Building <br /> Official and Director of Community Development certifying the pad elevations and building <br /> locations (setbacks) are conforming to the approved plans, prior to receiving a foundation <br /> inspection for the structures. <br /> 23. BUILDING HEIGHT CERTIFICATION: The applicant shall submit a building height certification <br /> prepared by a California licensed land surveyor or civil engineer to the Director of Community <br /> Development before the first framing or structural inspection by the Building and Safety Division. <br /> The height of the structures shall be surveyed and verified as being in conformance to the <br /> approved building heights as shown on Exhibit B or as otherwise conditioned. <br /> 24. FINAL INSPECTION: Final inspection by the Planning Division is required prior to occupancy. <br /> 25. TRANSFORMERS: New electrical transformers shall be placed underground, or aboveground <br /> and screened from view to the satisfaction of the Director of Community Development. Details of <br /> the new electrical transformers, and any screening architecturally compatible with the building, <br /> shall be included in the building permit submittal and shall be subject to the review and approval <br /> PUD-134/P18-0332/P18-0334 City Council <br /> Page 4 of 19 <br />