My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
101519
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2019 3:56:45 PM
Creation date
10/9/2019 3:56:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/15/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the other elements presented). Staff also received email communication from one <br /> resident (included as Attachment 3) expressing opposition to the speed lumps. <br /> Construction <br /> The City's Streets Division is scheduled to install the six speed lumps in late October/ <br /> early November 2019. The estimated construction cost is $10,000 and will be funded <br /> through the Annual Expedited Speed Lump Program (CIP No. 20534). <br /> Submitted by: Fisca -R view: Approved b : <br /> Brian Dolan Tina Olson Nelson Fialho <br /> Acting Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1. Touriga Drive Speed Lump Location Map <br /> 2. Concord Street Speed Lump Location Map <br /> 3. Resident Email Re. Concord Street Speed Lumps <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.