My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PARKS AND RECREATION
>
2019
>
101019
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 12:54:50 PM
Creation date
10/7/2019 1:16:37 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LIONS WAYSIDE AND DELUCCHI PARKS <br />This project will result in the final design and construction of Lions Wayside and <br />Delucchi Parks. Initial construction drawings to construct the box culvert across Lions <br />Wayside Park in the location of the current open channel were based on the Master <br />Plan for Lions Wayside and Delucchi Parks by R.J. Larson and Associates. The Master <br />Plan proposed to cover a portion of the drainage channel through Lions Wayside Park, <br />to relocate the band shell, and to provide a larger lawn area for concerts. The City was <br />unable to obtain approval for the project as proposed from the California Regional <br />Water Quality Control Board (RWQCB) and has been working for the last 5 years to <br />determine a plan option that would be acceptable to the RWQCB. <br />Project Status: The City is coordinating with the RWQCB. The below tasks have been <br />simplified to only show the last two years' worth of efforts. <br />■ In mid -2018 the Regional Water Quality Control Board informed the City that <br />none of the submitted plans would be approved due to impact to Kottinger Creek. <br />• The City hired Richard Larson of MIG to design concept plans that may be <br />acceptable to the Regional Water Quality Control Board. The City met with and <br />reviewed the concept plans on September 4, 2018. <br />■ Four schematic plans (shown below) for Lions Wayside and Delucchi parks were <br />presented to City Council for review and discussion on October 2, 2018. <br />■ On December 18, 2018 the City approved a professional services agreement <br />with MIG in the mount of $156,105 to update the Lions Wayside and Delucchi <br />Park Master Plan. <br />■ In early February 2019 the City purchased the properties adjacent to Lions <br />Wayside Park at 4363 and 4377 First Street. <br />■ City Council prioritized Wayside and Delucchi parks on March 19, 2019 when <br />Council adopted their two year work plan. <br />■ The City has been in contact with Brian Wines at the RWQCB to set-up a <br />meeting to discuss the schematic plans and path to move forward with the <br />project. <br />The City met with the RWQCB in August to review concepts that should meet the <br />requirements of the RWQCB. <br />PLEASANTON PIONEER CEMETERY <br />The Pleasanton Pioneer Cemetery improvements consist of implementation of the <br />Pioneer Cemetery Master Plan. The first phase was the construction of the Veteran's <br />Memorial and the second phase included a storage and parking area. The next phase <br />includes the entry and wayfinding improvements. <br />Project Status: Construction of the Entry and Wayfinding Improvements is underway. <br />■ The Pioneer Cemetery Master Plan was adopted by City Council on November <br />18, 2014. <br />Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.