Laserfiche WebLink
100. WATER EFFICIENT LANDSCAPE ORDINANCE (WELD): The project shall comply with the City <br /> of Pleasanton's Water Efficient Landscape Ordinance (WELO) and Bay Friendly Basics <br /> Landscape Checklist. The applicant shall submit a Landscape Documentation Package in PDF <br /> format to the Landscape Architecture Division, which shall be subject to review and approval by <br /> the City Landscape Architect prior to building permit issuance. The Landscape Documentation <br /> Package shall include: <br /> a. Project Information; <br /> b. Water Efficient Landscape Worksheet; <br /> c. Soil management report; <br /> d. Landscape design plan; <br /> e. Irrigation design plan; and <br /> f. Grading design plan. <br /> 101. CERTIFICATE OF COMPLETION: Upon completion of construction and prior to final inspection <br /> by the Building and Safety Division, the applicant's landscape architect shall submit a Certificate <br /> of Completion Package in PDF format to the Landscape Architecture Division for review and <br /> approval. The Certificate of Completion Package shall include: <br /> a. Project information sheet; <br /> b. Certificate of installation according to the landscape documentation package; <br /> c. Irrigation scheduling; <br /> d. Schedule of irrigation, landscape and irrigation maintenance; <br /> e. Landscape irrigation audit report; and <br /> f. Soil management report (if not previously submitted). <br /> 102. LANDSCAPING INSTALLATION: Prior to building permit final all landscaping shall be installed as <br /> shown on the approved building permit set and shall be inspected and approved by the <br /> Landscape Architecture Division. <br /> 103. MAINTENANCE: The applicant and all future owners of the property shall, at no expense to the <br /> City, maintain all the landscaped areas related to the project in a healthful, attractive and <br /> reasonably weed-free manner consistent with the approved landscape plan, for the duration of <br /> the existence of the project. <br /> Trees <br /> 104. TREE REPORT: The applicant shall comply with the recommendations of the tree report <br /> prepared by HortScience Bartlett Consulting dated "Received" July 3, 2019. No tree trimming or <br /> pruning other than that specified in the tree report shall occur. The applicant shall arrange for the <br /> Project Arborist to conduct a field inspection prior to building permit issuance to ensure all <br /> recommendations have been properly implemented. The Project Arborist shall certify in writing all <br /> recommendations have been followed. The project arborist's contact information shall be printed <br /> on the plans. (PROJECT SPECIFIC CONDITION) <br /> 105. TREE REMOVAL MITIGATION: Any trees approved to be removed by the City shall have its full <br /> value paid into the City's Urban Forestry Fund. A credit for replanting trees shall be as follows: <br /> a. $200 credit for a 15-gallon size replacement tree; <br /> b. $400 credit for a 24-inch box size replacement tree; and <br /> c. $800 credit for a 36-inch box size replacement tree. <br /> 106. TREE BOND: Any tree affected by development/construction must be protected per the Municipal <br /> Code. The applicant shall post cash, letter of credit, or other security satisfactory to the Director of <br /> PUD-133 Planning Commission <br /> Page 16 of 18 <br />chitect prior to building permit issuance. <br /> PUD-133 Planning Commission <br /> Page 15 of 18 <br />ions only. Plan check comments and approval DO NOT include: 1.) Installation of the on- <br /> site fire mains and fire hydrants. Specific installation drawings submitted by the licensed underground fire <br /> PUD-133 Planning Commission <br /> Page 14 of 18 <br /> issuance of a <br /> encroachment, grading or subdivision permit, whichever occurs first. The City will retain the cash <br /> deposit until all work is substantially complete, all areas are stabilized, and all hazards are <br /> mitigated to the satisfaction of the Director of Engineering/City Engineer. <br /> PUD-133 Planning Commission <br /> Page 13 of 18 <br />ge 12 of 18 <br /> The applicant's California licensed geotechnical engineer shall inspect and approve the <br /> PUD-133 Planning Commission <br /> Page 9 of 18 <br />