Laserfiche WebLink
approve earlier construction "start times" or later "stop times" only for specific construction <br />activities (e.g., concrete pouring) if it can be demonstrated to the satisfaction of the Director of <br />Community Development that the expanded construction hours are necessary (e.g., the <br />concrete foundations need to be poured early due to weather conditions). Construction <br />equipment would be required to meet DMV noise standards and be equipped with muffling <br />devices. <br />As required by the General Plan, the noise study is required to include an analysis of railroad - <br />induced ground vibration. The General Plan requires that the project demonstrate that it would <br />be compatible with the vibration impact criteria established by the Federal Transit <br />Administration (FTA). For a residential project within 200 feet of a rail line, the FTA advises <br />further investigative study to determine any potential impacts from railroad vibration. The <br />proposed project is almost 500 feet from the nearest rail line. At this distance, this project is <br />significantly beyond the maximum FTA screening distance and would be categorized as "no <br />vibration impact likely." Per the FTA, no further study is required. <br />PROJECT SITE ALTERNATIVES <br />As outlined in the above analysis staff believes the project density, development standards, <br />architecture, site design, lot configuration, and landscaping, as proposed and conditioned, <br />would be compatible with the other homes in the vicinity and not create adverse impacts, and <br />recommends the Planning Commission approve the project as proposed and conditioned. <br />However, alternatives to the proposal that could be considered by the Planning Commission <br />include: <br />1. Recommend denial of the project to the City Council; or <br />2. Recommend approval of the PUD development plan with modifications. The Planning <br />Commission could recommend approval of the project with modifications to the <br />development standards, architecture, landscaping, or other site improvement changes. <br />Since staff believes the project will not adversely impact any properties or the surrounding <br />area, that the project has been designed to be compatible with the existing homes in the area <br />and conforms to the DSP and design guidelines, staff recommends that neither of the two <br />project alternatives above be pursued. <br />PROS AND CONS FOR THE PROPOSED PROJECT <br />Pros <br />Cons <br />Allows appropriate development on a <br />j New development would be added to an <br />property zoned for a residential use. <br />i established neighborhood. <br />Furthers the implementation of the <br />The project would incrementally increase traffic, <br />Downtown Specific Plan. <br />noise, activity, and parking demand on Stanley <br />Boulevard. <br />Enhanced landscaping along the project <br />Existing trees would be removed to <br />frontage and rear and side yards would <br />accommodate the development. <br />soften the appearance and reduce visual <br />impacts of the new homes. <br />PUD -133, 3987 Stanley Boulevard Planning Commission <br />11 of 12 <br />