Laserfiche WebLink
Site Development and Building Design <br /> 9. BUILDING MATERIALS AND COLORS: The building materials and colors in the Approved Plans <br /> shall be stated on the building permit plans. <br /> 10. PAVING MATERIALS: The color, material, design, and product specifications for the paving <br /> materials used on-site shall be in conformance with the Approved Plans and included with the <br /> building permit submittal. Any proposed modifications to the final paving design details shall be <br /> subject to review and approval by the Planning Division prior to issuance of building permits. <br /> 11. WINDOWS: Manufacturer type, design, material, and installation details for all windows within the <br /> project shall be specified for each unit/building in conformance with the Approved Plans in the <br /> building permit submittal. Any proposed modifications shall be subject to review and approval by <br /> the Planning Division prior to issuance of building permits. <br /> 12. COLOR SCHEME: The applicant shall paint a portion of the building with the color scheme in <br /> conformance with the Approved Plans. Primary and secondary (accent) paint colors should be <br /> painted next to each other on the building, to the extent feasible, for purposes of inspection for <br /> conformance with the Approved Plans. The colors shall not be considered in conformance with <br /> the Approved Plans until after inspection and verification by the Planning Division. Any proposed <br /> modifications shall be subject to review and approval by the Planning Division. <br /> 13. SIGN PROGRAM: Site and building signage shall be reviewed under a comprehensive sign <br /> program submitted to the Planning Division under a separate application. <br /> 14. FENCE/WALL: All fencing and walls shall be shown on the construction plans with the building <br /> permit submittal. The design and location must be approved by the Planning Division and comply <br /> with all setback requirements. <br /> 15. OUTDOOR STORAGE: There is to be no outdoor storage without prior approval by the City. <br /> 16. LIGHTING PLAN: The applicant shall submit a lighting plan with the building permit submittal. <br /> The plan shall include photometric contours, manufacturer's specifications on the fixtures, and <br /> mounting heights. All exterior lighting including landscape lighting shall be directed downward and <br /> designed or shielded so as to not shine onto neighboring properties or streets. The photometrics <br /> shall be reviewed and approved by the City Traffic Engineer and Director of Community <br /> Development prior to building permit issuance. The type and location of all exterior light fixtures <br /> shall be reviewed and approved by the Director of Community Development prior to building <br /> permit issuance. <br /> 17. BUILDING SURVEY: The applicant shall submit a building survey and/or record of survey and a <br /> site development plan in accordance with the provisions of Chapter 18.68 of the PMC. These <br /> plans shall be approved by the Chief Building Official prior to building permit issuance. The site <br /> development plan shall include all required information to design and construct site, grading, <br /> paving, drainage, and utilities. <br /> 18. PAD AND SETBACK CERTIFICATION: The applicant shall submit a pad elevation certification <br /> prepared by a California licensed land surveyor or registered civil engineer to the Chief Building <br /> Official and Director of Community Development certifying the pad elevations and building <br /> locations (setbacks) are conforming to the approved plans, prior to receiving a foundation <br /> inspection for the structures. <br /> P16-1349 and PUD-121 Planning Commission <br /> Page 4 of 19 <br />rmitted. <br /> P16-1349 and PUD-121 Planning Commission <br /> Page 3 of 19 <br />-121, 6455 Owens Drive Planning Commission <br /> 10 of 15 <br />