My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
090319
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2019 2:19:00 PM
Creation date
8/28/2019 2:18:59 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/3/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Alternative 4— Elevated Two-way Separated Bikeway with Landscaping (High Cost) <br /> Additionally, Mark Thomas will prepare planning level cost estimates for intersection treatments and/or <br /> modifications along the project alignment. It is assumed that each intersection will have up to two variations that <br /> will be estimated as a part of this task. These estimates are conceptual in nature and will be rough order of <br /> magnitude with a 30% contingency. Unit costs will be based upon recent, relevant bid prices, the Caltrans cost <br /> database and other relevant sources of cost data. <br /> Task 5 Deliverables <br /> • Seven (7) Initial Concept Design Plan Sets (11"x17") <br /> • Planning-level Cost Estimates in PDF Format <br /> New Task to be Added <br /> Task 8. 35% Design <br /> Once the preferred alternative has been selected, Mark Thomas will prepare a 35%design for the project. Toole <br /> Design will support Mark Thomas by providing oversight and reviewing submissions for consistency with the <br /> preferred concept alternative. Plans will be prepared to confirm rough geometrics and major design features so <br /> that once confirmed, the major design elements may be detailed efficiently and effectively at later design stages <br /> without redesign. To this end,the 35% plans will focus on the major physical improvements (layout and alignment <br /> of lanes, turn pockets, striping, intersection improvements, and traffic signal layouts). Plans will be cut and drafted <br /> focusing on the gross level physical improvements without detail, enabling the identification of primary <br /> construction elements and bid items. The project plans will include the following sheets: <br /> • Title Sheet (1) <br /> • Key Map (1) <br /> • Typical Cross Sections (4) <br /> • Layout and Striping Plans 1"=40' scale (15) <br /> • Construction Details (17) <br /> • Layout Plan of Major Signal Equipment (9) <br /> It is assumed we will prepare a total of 47 sheets. A construction cost estimate based on the project plans will be <br /> prepared and unit costs will be based upon recent, relevant bid prices, the Caltrans cost database and other <br /> relevant sources of cost data. It is assumed we will use open source (free) aerial image files for the basis of <br /> design and background for the plan sheets, therefore the design will not include computed baselines, or any <br /> vertical information. Topographic surveys will be completed after the geometrics shown in the 35%design have <br /> been approved by the City. <br /> Task 8 Deliverables <br /> • 35% Plans for preferred alternative <br /> • Cost Estimate for preferred alternative <br />
The URL can be used to link to this page
Your browser does not support the video tag.