My WebLink
|
Help
|
About
|
Sign Out
4_Exhibit A
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2010-2019
>
2019
>
08-28
>
4_Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 3:43:37 PM
Creation date
8/21/2019 3:43:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/28/2019
Document Relationships
4
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2010-2019\2019\08-28
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
125. FOG PROGRAM: Unless it is determined not required by the Director of the Director of <br /> Operations and Water Utilities Department, the applicant shall obtain a wastewater discharge <br /> permit from the Director of Operations and Water Utilities and comply with the grease interceptor <br /> requirements as set forth in PMC Section 15.44. (Project Specific Condition) <br /> TRAFFIC ENGINEERING DIVISION — 925-931-5677 <br /> 126. TRAFFIC CONTROL PLAN (TCP): A comprehensive traffic control plan shall be submitted to the <br /> City Traffic Engineer for review and approval. Best management practices to minimize traffic <br /> impacts shall be used during construction, including scheduling of major truck trips and deliveries, <br /> to avoid peak travel hours. The TCP shall have proper lane closure procedures such as flagger <br /> stations, signage, cones, and other warning devices implemented during construction. The TCP <br /> shall also include time of day/hours of lane closures and total number of days. <br /> 127. TRUCK ROUTES: The haul route for all materials to and from the project site shall be reviewed <br /> and approved by the City Traffic Engineer prior to building permit issuance and shall include the <br /> provision to monitor the street surfaces used for the haul route so that any damage and debris <br /> attributable to the haul trucks is identified and corrected at the expense of the applicant. <br /> 128. TRAFFIC IMPACT FEES: The applicant shall pay any traffic impact fees for the development as <br /> determined by the City Traffic Engineer. The fee shall be paid prior to building permit issuance. <br /> [end] <br /> PUD-134/P18-0332/P18-0334 Planning Commission <br /> Page 19 of 19 <br />preventer assemblies shall be tested and certified by a City approved tester with the certification <br /> submitted to the City's contractor, Aqua Backflow. Testing will be performed at the time City <br /> water is turned on to the site. If an existing backflow preventer is on the site it shall be tested and <br /> certified by an approved tester with the certification submitted to the City's contractor, Aqua <br /> Backflow, before project water is drawn through it. An all-weather cover shall be placed over all <br /> backflow prevention assemblies 4 inch and smaller. <br /> 122. RECYCLED WATER: Recycled water should be used on site during the grading and construction <br /> period. However, under any declared stage of water shortage, recycled water must be used <br /> throughout the grading and construction period. <br /> 123. RECYCLED WATER USE REQUIREMENT: If the site is within the city's recycled water service <br /> area (recycled water distribution system is along route to the proposed application), the irrigation <br /> system must be designed in accordance with the City's Recycled Water Use Guidelines and <br /> Recycled Water Irrigation Standards, per PMC Section 14.06. Refer to PMC Section 14.20 for a <br /> list of exceptions. <br /> 124. RECYCLED WATER USE PERMIT: The applicant shall submit a Recycled Water Use Permit <br /> application and package (as outlined in the City's Recycled Water Use Guidelines available <br /> online), to the Recycled Water Program (925-931-5513). The Recycled Water Use Permit <br /> application and package shall be submitted concurrently with the building permit submittal, and <br /> shall be conditionally approved by the Recycled Water Program prior to building permit issuance. <br /> Final approval by the Recycled Water Program is required before the start of recycled water <br /> service. Refer to PMC Section 14.06 for the regulations of recycled water use. <br /> PUD-134/P18-0332/P18-0334 Planning Commission <br /> Page 18 of 19 <br />ommission <br /> Page 17 of 19 <br />ments of completion of construction, whichever is later, and shall be forfeited if the trees <br /> are destroyed or substantially damaged. An arborist shall be onsite during any tree work (i.e. root <br /> pruning, trimming, setting up tree protection, etc.). The bond or security may be released early <br /> with a certification letter by the arborist confirming he/she was present during said tree work and <br /> work was performed in accordance with the arborist's recommendations. <br /> PUD-134/P18-0332/P18-0334 Planning Commission <br /> Page 16 of 19 <br />