My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
082019
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2019 2:11:21 PM
Creation date
8/14/2019 2:11:15 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/20/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The private street (Young Court) and the following improvements located within <br /> the private street: sanitary sewer laterals, storm drain systems, three streetlights, <br /> landscaping and irrigation, and related improvements; and <br /> • The storm drain systems on Lots, 1, 2 and 3; and <br /> • The landscaping along the Dublin Canyon Road frontage; and <br /> • Bioswales located on Lots 1 and 3. <br /> Partial Release of Improvement Security <br /> Section 66499.7 "Manner of release of security" of the Subdivision Map Act provides the <br /> process by which a developer may request, and how a legislative body may provide, the <br /> partial release of improvement security. <br /> As stated in the Background, AH Development Group, LLC has completed all the <br /> private and public improvements, except for a private bioswale on Lot 3. The bioswale <br /> cannot be constructed until the remaining home on Lot 3 is completed as a matter of <br /> construction sequencing. The construction of Lot 3 is scheduled to start in spring 2020. <br /> Lot 2 is the site of the existing home; Lot 1 is completed. <br /> If the City Council accepts the public improvements, the performance bond and the <br /> labor material bond, in amounts of$361,910 each, will be exchanged for similar bonds <br /> in an amount of$36,191, which have been provided by AH Development Group, LLC to <br /> ensure the construction of the Lot 3 bioswale. This amount is sufficient to ensure the <br /> construction of the bioswale in the unlikely event that AH Development Group, LLC fails <br /> to complete such work. <br /> Submitted by: Fisc I eview: Approve. ;by: <br /> 10 <br /> Stephen irkpatrick Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Attachment: <br /> 1. Vicinity Map <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.