Laserfiche WebLink
shallow blemishing from tire turning movements as was previously encountered. <br /> Additional testing of the samples provided during placement reaffirmed that the material <br /> met the project specifications. Detailed inspections confirmed proper placement of the <br /> slurry seal. The work areas continue to be monitored. The amount of new surface <br /> blemishes has been greatly reduced and the existing blemishes are healing over. Staff <br /> reviewed placement of slurry seal in other cities within the Tri-Valley Area and found <br /> similar blemishing within similar residential neighborhoods. <br /> It is recommended that the project be accepted as complete as the work has been <br /> completed by American Asphalt Repair & Resurfacing Company, Inc. to the Director of <br /> Engineering's satisfaction. <br /> Submitted by: Fiscal {review: Approved <br /> Stephen ' ► patrick Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Attachments: <br /> 1. Funding and Expenditures Summary <br /> Page 6 of 6 <br />