Laserfiche WebLink
47. Internally Illuminated Transportation/Traffic Project <br />Street Name Sign <br />Replacement with LED <br />The city's internally illuminated street name signs (IISNS) are becoming faded and <br />require replacement. The city is in its fourth year of a 5 -year plan to replace the existing <br />fluorescent tube IISNS with LED IISNS. The LED signs consume less power which will <br />reduce the power cost per intersection as well as the carbon footprint of the city. <br />Installation of the IISNS started in May 2016. Over 100 signs have already been <br />replaced. The focus this year will continue to be on the most faded signs which are along <br />several arterials in the city. The 2019 installations are complete. <br />• Status Under Review <br />• Next Steps/Details: Install the IISNS in spring and summer 2020 <br />• Applicant: City of Pleasanton <br />• Staff Contact(s): Mike Tassano <br />48. Owens at Iron Horse Trail Transportation/Traffic Project <br />Crossing Modification <br />Owens Drive Adaptive <br />Staff presented the results of the six-month study to City Council in January 2018 and <br />Council recommended that an adaptive signal timing system be purchased to address the <br />one-two minutes per day where congestion remains. A Capital Improvement Program <br />(CIP) to install adaptive signal system was added to the 2018/19 CIP. <br />• Status Under Review <br />• Next Steps/Details: The Adaptive Signal hardware has been purchased and <br />delivered and the system should be installed in the <br />Summer of 2019. <br />• Applicant: City of Pleasanton <br />• Staff Contact(s): Mike Tassano <br />49. Intersections of Transportation/Traffic Project <br />Stan leyNa l leyBe rn a 1, <br />Santa RitaNalley, Santa <br />Rita/Stoneridge <br />World Smartest Intersection <br />Installation of next generation traffic signal equipment for signal performance, conflict <br />analysis, origin -destination studies, multi -modal traffic safety and connected vehicle <br />applciations. <br />• Status Under Construction <br />• Next Steps/Details: Receive equipment and Installation/programming. This <br />will occur Summer 2019. <br />• Applicant: City of Pleasanton <br />• Staff Contact(s): Mike Tassano <br />Page 16 of 20 <br />