DRAFT Arborist Report—Chashmawala Residence HortScience I Bartlett Consulting
<br /> 4108 Foothill Road, Pleasanton Page 7
<br /> PROTECTION ZONE shall be established at the dripline in all directions. No grading,
<br /> excavation, construction or storage of materials shall occur within that zone.
<br /> 3. Underground services including utilities, sub-drains, water or sewer shall be routed
<br /> around the TREE PROTECTION ZONE. Where encroachment cannot be avoided, special
<br /> construction techniques such as hand digging or tunneling under roots shall be employed
<br /> where necessary to minimize root injury.
<br /> 4. Tree Preservation Notes, prepared by the Consulting Arborist, should be included on all
<br /> relevant plans.
<br /> 5. Any herbicides placed under paving materials must be safe for use around trees and
<br /> labeled for that use.
<br /> 6. Irrigation systems must be designed so that no trenching will occur within the TREE
<br /> PROTECTION ZONE.
<br /> 7. Do not apply lime to the soil for compaction purposes within 25' of the dripline of the tree.
<br /> Lime is toxic to roots.
<br /> Pre-construction treatments and recommendations
<br /> 1. The demolition contractor and construction superintendent shall meet with the Consulting
<br /> Arborist before beginning work to discuss work procedures and tree protection.
<br /> 2. Fence all trees to be retained to completely enclose the TREE PROTECTION ZONE prior to
<br /> demolition, grubbing or grading. Fences shall be 6 ft. chain link or equivalent as
<br /> approved by Consulting Arborist. Fences are to remain until all grading, construction and
<br /> landscaping is completed. Place weather proof signs, 2' x 2', on the fencing that read
<br /> "TREE PROTECTION ZONE Keep Out" (eg. one sign for each of the four compass points).
<br /> 3. Tree(s)to be removed that have branches extending into the canopy of tree(s)to remain
<br /> must be removed by a qualified arborist and not by demolition or construction
<br /> contractors. The qualified arborist shall remove the tree in a manner that causes no
<br /> damage to the tree(s)and understory to remain. Stumps shall be ground below grade.
<br /> 4. Any brush clearing required within the TREE PROTECTION ZONE shall be accomplished
<br /> with hand-operated equipment.
<br /> 5. If structures and underground features have to be removed within the TREE PROTECTION
<br /> ZONE it shall be done by hand or using the smallest equipment, and operate from outside
<br /> the TREE PROTECTION ZONE. The Consulting Arborist shall be on-site during all
<br /> operations within the TREE PROTECTION ZONE to monitor demolition activity.
<br /> 6. Prune trees to be preserved to clean the crown and to provide clearance. All pruning
<br /> shall be done by a State of California Licensed Tree Contractor(C61/D49). All pruning
<br /> shall be done by Certified Arborist or Certified Tree Worker in accordance with the Best
<br /> Management Practices for Pruning (International Society of Arboriculture, 2002)and
<br /> adhere to the most recent editions of the American National Standard for Tree Care
<br /> Operations(Z133.1)and Pruning (A300).
<br /> 7. All tree work shall comply with the Migratory Bird Treaty Act as well as California Fish
<br /> and Wildlife code 3503-3513 to not disturb nesting birds. To the extent feasible tree
<br /> pruning and removal should be scheduled outside of the breeding season. Breeding bird
<br />the trees are growing on an undeveloped lot,which affects the site and contribution
<br /> ratings.
<br /> Page 11 of 12
<br /> Planning Commission
<br /> Page 6 of 12
<br />neer;
<br /> b. Show construction vehicles and equipment parking area, materials storage, temporary
<br /> fencing, construction trailer location, and construction contractors/workers parking
<br /> area.
<br /> P19-0059 Planning Commission
<br /> Page 5of12
<br />-0059 Planning Commission
<br /> Page 4 of 12
<br /> LUXti11 a I.L -
<br /> �[ ,443_1:8,,...i1,...'3'--,14445.5-41'0-11_14.22: . '
<br /> ry" 0 �1 202- F�:. �,� P 43017 AI i l)43! 1, ,406! 11.410r411:051_13121-14_4814511
<br /> � 145 ,423 i _�1533 1h`�
<br /> t• m 3 R A L� .. .. _ 1 t / - ,4� 1-- �]4`Y9_+1 1418 1411i1-Q
<br /> ,r. F 'v 2oas } ?' r ( v S I a -T 1 14011 �.J45, i 1414 1415 1535:.:,1527 1 1
<br /> l�I I I 1 it :;f':).i''.407 1520
<br /> ,.4 �� 1 1.148 �, 1515 1x45'
<br /> VALLEY A V ' itr,� D I '� 512 505
<br /> W 993 _ '� .a / , e s`' 1193
<br /> $+_ _
<br /> 1993 ,. 1 - 1 6 \ a g
<br /> Wy ,93 a '
<br /> ,95, RROU!<:1>;IZCF��ti'rY - kTII � M \ 1795 \'797
<br /> yl 1a1/ 1944
<br /> e
<br /> b 1787 v
<br /> • ISI i�
<br /> 939 . - j_____IL".:::::i
<br /> e ,,� �,�
<br /> w• 1965 1952 J \ _ 18gi ,alli3 '�, °n
<br /> n
<br /> ,92. ''4
<br /> „e01
<br /> glaY16.8 �,—� J I ” 0 1
<br /> 83q a i
<br /> 1863 ry , _, ..J
<br /> �iliY.tSchool Q ,90+ -„ ,860.,:-'� ,ems ,�� ^< !� "".� m 1.183 � 3� _ 1734 1638 ,1544 1536 15
<br /> 8x9 ,s„ m '924
<br /> t ,62
<br /> 1265 1
<br /> 44
<br /> m
<br /> ,sea =�=J_ I
<br /> .
<br /> 1 '
<br /> 976 m i 5 , laoe i ,Y U I Et 8
<br /> 979 e `
<br /> ,961 1614 r.,, ,-44 N +947 J � 11 - -
<br /> a +
<br /> C ice
<br /> I 1 I�I \ ��. ��N( I.w�U Si
<br /> ,8315 15,0 ,®7 ,926 � 19215 1967 } 1554 i �
<br /> 1 311
<br /> — 51,1171
<br /> '4 '14p RAN
<br /> 5y�� a q ty
<br /> 1885 180' 1805 1606 1841 1995 i 1992 J v : 17 A �1 b w' 'd1 ' a "' €y 7n R
<br /> MSS` 2 1 `"
<br /> . :id_AmLL)A I)u - 1 ' S: ei - 4 'iA 9 c/1
<br /> m 8 4
<br /> �)� .'- W 1495 1198 ,795 :66
<br /> ,789116991800 = 4 .f__+^ _s i \ _.
<br /> ` - zI. I ).`I.r 1��, �+ C1wti UY 11'Yv64LL:'1++. 615, N1n1 .7:z, 149:1; 2 1n5 16,1 ,�.,eCOITtiTlUltit�' i . c i » S q 0 8 0 S t 4.-. r:tiM. f\ 40U730 173 a 1772 1750 rr 1757 17� 1781 1761 1613 151 Z j"'r`"" 14. ' N ,� �' _ n g o
<br /> 1:4,500 V P
<br /> o 0.05 0.1 mi P19-0140, 1809 Santa Rita Rd. Suite A & B, Hill
<br /> Planning Division
<br /> , i i July 30,2019
<br /> FL£ NTON.
<br /> o 280 560 Feet
<br />
|